BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Dolton, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

All proposals or bids offered must be accompanied by a bid bond, cash, or certified check made payable to the Village of Dolton in the amount of not less than ten percent (10%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. PREQUALIFICATIONS OF BIDDERS in accordance with Section 102.01 of the Standard Specifications will be required of all bidders on this project. No bid shall be withdrawn after the opening of the proposals without the consent of the Mayor and the Board of Trustees of the Village of Dolton for a period of forty-five (45) days after the scheduled time of closing bids. The bidder is specifically advised that the Village of Dolton is a sub-grantee of the County of Cook of a grant made pursuant to the Housing and Community Development Act of 1974, pursuant to an agreement entered into and between the County of Cook and the Village of Dolton. Payments to the Contractor will be made by the Village of Dolton only after it has received the funds to make such payments from the County of Cook in accordance with the terms of the aforesaid agreement. Further, in compliance with the Stevens Amendment to the Department of Defense Appropriations Act of 1989, the (estimated/actual) percentage of the total cost of this project to be funded with federal dollars is (35%) and the exact dollar amount of federal funds which will be set aside for this Project will be based on the contract amount awarded under this offering. APPLICABLE FEDERAL REQUIREMENTS All laborers and mechanics employed by the Contractor or Subcontractor on construction work for this project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with the Davis-Bacon Act as amended (40 U.S.C. 276-276a-5), and shall receive overtime compensation in accordance with and subject to the provisions of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333), and the Contractor and Subcontractor(s) shall comply with all regulations issued pursuant to these Acts and other applicable Federal laws and regulations pertaining to labor standards. The Secretary of Labor has, with respect to the labor standards specified in this section, the authority and functions set forth in Reorganization Plan Number 14 of 1950 (5 U.S.C. 133z-15) and Section 2 of the Act of June 13, 1934, as amended (40 U.S.C. 276c). All contracts and Subgrantees for construction or repair shall include a provision for compliance with the Copeland "Anti-Kickback Act" (18 U.S.C. Section 874) as supplemented in Department of Labor Regulations (29 CFR, Part 3). Contracts shall include a provision for compliance with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor Regulations (29 CFR, Part 5). Each bidder is required to comply with Equal Employment Opportunity requirements for Community Development Block Grants, a copy of which is on file with the Village Clerk and is available for inspection. Compliance with "Section 3" which calls for affirmative action by the Contractor to train and/or hire lower income residents of the project area and to subcontract with local, small businesses is required on this project. An explanation of the Applicable Federal Requirements previously mentioned is provided in the Special Provisions section of the Bid Specifications. The successful bidder for the construction of the improvement will be required to file a performance bond equal to one hundred percent (100%) of the bid, with sureties to be approved by the Mayor and Board of Trustees which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract; and also that the bidder and contractor shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and materials furnished. The contractor shall be required to furnish sufficient insurance or guaranty of indemnity to the Village of Dolton, Illinois, and the County of Cook, Illinois, against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the Mayor and Board of Trustees of the Village of Dolton. The right to reject any and all proposals or bids is reserved.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
219
Bidding Soon
2,970
All Active Projects
1,285
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 16, 2022

June 16, 2022

img_map_placeholder

Multiple Locations, Dolton, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.