Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 22, 2022 at 8:00 PM
Updated October 1, 2024
Renovation of a fitness / recreation center in Augusta, Maine. Completed plans call for the renovation of a fitness / recreation center.
Roof Replacement Project at the former East Campus Wellness Center located at 6 Elkins Lane in Augusta, Maine. The building was constructed on or about 1988 and consists of approximately 13,000 square feet of ballasted EPDM membrane surfaces. The structural system consists of steel bar joists supported on concrete masonry unit (CMU) walls. Included in the 13,200-sf area above is an approximate 1,600 sf roof built adjacent to the locker room area that does not appear on the provided 1987 contract documents. All roofs have stone ballast over EPDM roofing system and Rigid insulation. All elements should be considered for replacement. Replacement construction will include vapor barrier, gypsum concrete roof board, mechanically fastened insulation system with an adhered EPDM membrane roof application. The cost of the work is approximately $ 400,000. The work to be performed under this contract shall be completed on or before the Final Completion date of 18 December 2022.
Award
Fitness / Rec Centers
$391,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2022
July 15, 2022
6 Elkins Ln, Augusta, ME
Related To This Project
Augusta, ME
Bid Date: Jun 27 2022
Augusta, ME
Bid Date: Jan 19 2023
Augusta, ME
Bid Date: Nov 24 2021
Augusta, ME
Bid Date: Nov 24 2021
Augusta, ME
Bid Date: Aug 11 2021
Augusta, ME
Bid Date: Sep 01 2021
Augusta, ME
Bid Date: Oct 13 2021
Augusta, ME
Bid Date: Nov 17 2021
Augusta, ME
Bid Date: Apr 27 2022
Augusta, ME
Bid Date: Jun 15 2022
Augusta, ME
Bid Date: May 24 2022
Augusta, ME
--
Augusta, ME
Bid Date: Apr 20 2022
Augusta, ME
Bid Date: Jun 06 2022
Augusta, ME
Bid Date: Jun 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.