BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of a mixed-use development in Marriott Slaterville, Utah. Completed plans call for the renovation of a educational facility.

Refinish restroom floors in K-8 and 9-12 buildings at Venture Academy. Venture Academy plans to resurface (clearcoat) 18 restrooms and 3 common areas at its K-8 building located at 495 N 1500 West, Marriott-Slaterville, Utah 84404 as well as resurface 14 restrooms with grey epoxy at 508 N 1500 West, Marriott-Slaterville, Utah 84404. Quote must include the following: 1. Price for K-8 Building (select restrooms and common areas): Clean and prepare existing clearcoat surface for new clearcoat for 18 restrooms and 3 common areas (see attachment) repair several areas where existing epoxy has come up from concrete floor (see attachment) Tape off and protect existing thresholds, vinyl wall base, walls, carpet, etc. Toilets will be removed by Venture Academy before project will begin Apply clear epoxy coating to all restrooms and common areas on floors. Seal floor to wall corners for waterproofing. 2. Price for HS Building (select restrooms) Strip existing grey epoxy coating that is breaking away from concrete floor in 14 restrooms (see attachment) Remove old joint caulking from concrete joint lines Property etch and prepare concrete for new epoxy coating. (Avoid current issue of epoxy not adhering to concrete) Tape off and protect existing thresholds, vinyl wall base, walls, carpet, etc. Toilets will be removed by Venture Academy before project will begin Apply matching grey epoxy to restroom floors. Epoxy should run into concrete joint lines but not fill them. Seal floor to wall corners for waterproofing. Apply expandable grey caulking to concrete joint lines after epoxy dries. Contract Award Date: No later than May 20, 2022 at 5:00 pm MST Project Start Date (Earliest): No earlier than July 6, 2022 Project Final Completion Date: No Later than July 29, 2022

Post-Bid

Educational

$30,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
72
Bidding Soon
986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2022

June 15, 2022

Project location map

Multiple Locations, Marriott Slaterville, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.