BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a road / highway in Myakka City, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of October 28, 2022, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 01 Selection Method : Letter of Response and Interview Professional Liability Insurance : $250,000.00 SR 700 (US 98) From E of Floral Dr to N of Bridge 090032 Financial Management Numbers : 44788713201 44788713202 44912213201 44912213202 Project Description : SR 72 FROM US 41 (SR 45) TO HONORE AVE TRC Members (Subject to Change) : David Bogner Jonathan Cando Troy Norwood The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Longlist Date/Time 6/09/2022 11:00 pm Shortlist Selection Date/Time 6/14/2022 07:00 pm Phase II Submittal Deadline Date/Time 6/29/2022 12:30 am Technical Review Committee Meeting 1 Date/Time 6/30/2022 12:15 am Consultant Interviews Date/Time 6/30/2022 Final Selection Date/Time 7/12/2022 07:00 pm Negotiations Period Begin Date 7/20/2022 Negotiations Period Ending Date 9/01/2022 The method of contractor selection has not been determined at this time. FDOT -RFP Engineering - SR 72 From US 41 (SR 45) to Honore Avenue

Conceptual

Roads / Highways

$38,421,128.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
143
Bidding Soon
1,986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

Project location map

FL-72, Myakka City, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.