BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Raleigh, North Carolina. Contact the soliciting agency for additional information.

The comprehensive study will derive the vision, space principles, and program requirements/adjacencies (including dining facilities) in the D.H. Hill, Jr. Library for long-range planning to align with the Libraries strategic goals. This effort will also consider library facility trends. The facility totals 383,709 GSF and comprises four separate, but connected, buildings: 1. East Wing, built in 1953, with 103,744 GSF 2. West (Erdahl-Cloyd) Wing, built in 1954, with 59,783 GSF 3. North (Old) Bookstack Tower, built in 1972, with 109,169 GSF, and 4. South (New) Bookstack Tower, built in 1990, with 111,013 GSF To adequately meet programmatic requirements, the study must address current deficiencies and future needs for building systems/infrastructure, service access and loading areas, building code, fire protection/life safety, and general safety issues. The deliverables will include a final report with a proposed high-level program and blocking and stacking diagrams plus a prioritized list of future projects, with preliminary cost estimates, that align with the determined vision, space principles, and strategic goals. Project Budget & Design Scope The budget of $125,000 includes all design fees and reimbursable expenses Project SiteThe project is located at 2 Broughton Dr., Raleigh, NC 27607 in the North Campus Precinct Design Process: The selected firm will work through the Office of the University Architect along with a building committee that includes user representatives. The process will follow normal design procedures and University guidelines. Questions/Proposal Submittal In order that the selection process be as objective as possible, do not contact members of the Board of Trustees, or any university officials other than the project manager. All questions and project submittals are to be directed to: Sumayya Jones-Humienny, Project Manager NC State University Office of the University Architect Campus Box #7519 2601 Wolf Village Way Raleigh, NC 27695 Phone: 919-515-2399 or Cell: 919-608-4436 Email: sjoneshu@ncsu.edu The method of contractor selection has not been determined at this time

Conceptual

Library

$125,000.00

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
45
Bidding Soon
1,235
All Active Projects
512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2023

img_map_placeholder

2 W Broughton Dr, Raleigh, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.