EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 10, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Harrisburg, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of January 10, 2023, project was awarded to Rogele, Inc., awarded amount is $5,199,248.57. The recording of the pre-bid will be uploaded in the documents section on PennBid. Join Zoom Meeting Meeting ID: 831 4349 3935 Passcode: 566208 One tap mobile +13462487799,,83143493935#,,,,*566208# US (Houston) +16694449171,,83143493935#,,,,*566208# US Dial by your location +1 346 248 7799 US (Houston) +1 669 444 9171 US CLARIFICATION DEADLINE 11/16/2022 2:00 PM This Project focuses on four green stormwater infrastructure sites within the City of Harrisburg. The work on these projects includes right-of-way green stormwater infrastructure (GSI) and community gathering spaces with adjacent rain gardens and swales on vacant lots and a community center site. Elements within these projects include, but are not limited to, installation of subsurface detention, porous pavement and porous asphalt, tree pits, sidewalk planters, stormwater bumpouts, drainage system improvements including inlets and connected laterals, site furnishings and planting, and Americans with Disabilities Act (ADA) compliant curb ramps. The work is geographically located at Midtown (4th Street between Harris and Reily Streets and Harris Street between Fulton and Logan Streets), Boys & Girls Club (1227 Berryhill Street), Peffer (4th and Peffer Streets), and Swatara (430-418 S 15th Street) as indicated on the drawings. The work includes all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: This Project focuses on four green stormwater infrastructure sites within the City of Harrisburg. The work on these projects includes right-of-way green stormwater infrastructure (GSI) and community gathering spaces with adjacent rain gardens and swales on vacant lots and a community center site. Elements within these projects include, but are not limited to, installation of subsurface detention, porous pavement and porous asphalt, tree pits, sidewalk planters, stormwater bumpouts, drainage system improvements including inlets and connected laterals, site furnishings and planting, and Americans with Disabilities Act (ADA) compliant curb ramps. The work is geographically located at Midtown (4th Street between Harris and Reily Streets and Harris Street between Fulton and Logan Streets), Boys & Girls Club (1227 Berryhill Street), Peffer (4th and Peffer Streets), and Swatara (430-418 S 15th Street) as indicated on the drawings. The work includes all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents. CLARIFICATION DEADLINE 6/14/2022 4:00 PM Notice is hereby given that Capital Region Water has adopted the Minority Women and Disadvantaged Business Enterprise Plan to ensure that minority, women, and other disadvantaged business enterprises have an equal opportunity to receive and participate in all project related construction contracts. Following the submission of DBE documentation in compliance with EPA Regulations regarding initial solicitations, it is the intent of Capital Region Water to ensure nondiscrimination in the award and administration of contracts, to create a level playing field on which minority, women, veteran, service-disabled-veteran, and LGBT-owned business enterprises can compete fairly for Capital Region Water Contracts and subcontracts, to help remove barriers to the participation of minority, women, veteran, service-disabled veteran, and LGBT-owned business enterprises and to assist the development of firms that can compete successfully in the marketplace outside of this program. CRW will establish minimum participation levels (MPLs) for the MBEs, WBE, and other DBEs on a project-by-project basis. Contracts awarded under this invitation are funded through the Pennsylvania Infrastructure Investment Authority (PENNVEST), supported in part by Federal funding. This Project and the Work performed thereon is subject to federal prevailing wage rate laws (Davis Bacon Act). Notice is also given that this project is being federally funded by the EPA financial assistance dollars and therefore requires all contractors to demonstrate compliance with federal Executive Order 11625, 12138, and 12432 and EPA Regulations at 40 CFR Part 30, et al., through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment services, and supplies by including state qualified small businesses and minority and women owned business enterprises in the bidding process. DBE documentation must be submitted with the Bid. Bidders shall use the CRW form included in the Bidding Documents. A Bid Security in the amount of ten percent (10%) of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. The Bidder to whom a Contract is awarded shall furnish a Performance Bond and a Payment Bond each in an amount equal to the Contract Price. The successful bidder and the Work performed on the Project must comply with the requirements for the purchase of American Iron and Steel in accordance with the provision of the Federal Consolidated Appropriations Act, January 17, 2014, P.L. 113, No. 76, 436 and the Pennsylvania Steel Products Procurement Act, March 3, 1978, P.L. 6, No. 3, 78 P.S. 1881 et seq. The Work shall be substantially complete 365 days after the date when the Contract Time commences. Bidders shall include a construction schedule demonstrating how they plan to sequence the construction of all four projects within the 365 day construction period to reach substantial completion. No Bid shall be withdrawn for a period of 60 days after the opening of Bids without written consent of the Owner. Capital Region Water reserves the right to reject any and all Bids, to waive any defects, errors, and omissions, irregularities, or informalities in a Bid or the Bid procedure, and to accept any Bid deemed to be favorable to its interest.

Award

Water / Sewer

$5,199,249.00

Public - County

Paving, Site Work

100

35

16

8

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Wall and Door Protection
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Schedules for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Unit Paving, Porous Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
98
Bidding Soon
1,365
All Active Projects
631
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

January 23, 2023

img_map_placeholder

Multiple Locations, Harrisburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase 4 Pennvest SW Pro-FI

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.