Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2022

June 16, 2022

Final Planning

Educational

$90,000.00

Public - City

img_map_placeholder

5101 W Harrison St, Chicago, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Site work for an educational facility in Chicago, Illinois. Working plans call for site work for a educational facility.

Department: Pre-Qualified Contractor Opportunities Provide Labor and Materials to: 1) Provide and install a new marquee sign. a) (1) 6' x 12' double-faced, LED-illuminated cabinet with a pair of 3'x 11'6" Electronic Message Centers (EMCs) b) Reuse the existing posts & pole covers, cutting the posts approx 10' to support the new cabinet. c) 3' x 3' illuminated topper cabinet d) (1) pair of 3'1" x 11'6", 20mm, full-color ThinkSign EMCs e) Wireless communications. System must tie in to the CPS network, not just a single PC. f) Software installation & Initial Software Training on school-provided PC. System must tie in to the CPS network, not just a single PC. g) Backlit, Lexan faces for the school name and/or logo h) Connect to an existing, working power supply. Provide any additional electrical work as needed. i) Connect to an existing, working Ethernet port. Provide additional cabling as needed. j) Use an existing, available Ethernet port somewhere on the west side of the building. If one is not available, contractor will need to run CAT-5 or CAT-6 and set up a port. 2) Relocate the existing sign. a) (1) 6' x 12' double-faced sign cabinet w/ Zip Tracks b) Remove the existing sign cabinet and relocate it to the southeast side of the building. c) Install (2) new posts into the ground and anchor with concrete. No pole cover. d) Bring power to sign. e) Contractor responsible for pulling sign permit. 3) Contractor to field verify dimensions and specifics of all before placing bid. 4) Not responsible for contractor errors as a result of non-field verification. 5) Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 10 15 00 EXTERIOR MARQUEE SIGNAGE b) SECTION 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES c) SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS d) SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS e) SECTION 26 05 33_13 CONDUIT FOR ELECTRICAL SYSTEMS f) SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS g) SECTION 26 41 13 LIGHTNING PROTECTION FOR STRUCTURES h) SECTION 26 43 00 SURGE PROTECTIVE DEVICES i) SECTION 27 05 03 COMMUNICATIONS GENERAL REQUIREMENTS j) SECTION 27 05 53 IDENTIFICATION FOR COMMUNICATION SYSTEMS k) SECTION 27 51 00 DISTRIBUTED AUDIO-VIDEO COMMUNICATIONS SYSTEMS 6) Secure job site overnight if work is not completed in one day. 7) If building or CPS properties are damaged during construction, replace and/or repair as necessary. 8) All questions/requests must be received 2 business days, prior to bid closing. 9) All work shall be coordinated with the Board authorized representative to complete in an agreed upon timeframe. 10) Clean the surrounding area and make sure all is swept of debris and excess mortar. 11) All trash must be removed offsite by vendor and area left clean. Questions Due Date: May 11th 2022, 10:00 AM CDT

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
351
Active Projects
214
Bidding Soon

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.