BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Fullerton, California. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of July 01, 2022 bids were rejected. No definite date for the rebid.** Multi-Site Project Title: Parking Lot Replacement NOTICE CALLING FOR BIDS Notice is hereby given that the governing board ("Board") of the Fullerton Joint Union High School District ("District") has determined that the following contractors and subcontractors must be prequalified prior to submitting a bid or proposal on the Multi-Site Parking Lot Replacement (Fullerton High School, Troy High School, Sunny Hills High School & Sonora High School) ("Project"): o All Prime contractors and subcontractors holding the following licenses must be prequalified with the District regardless of the value of the contract: o A, C12 - (REVISED-CORRECTED Per Addendum #1) These contractors and subcontractors must submit an original fully completed sealed Prequalification Questionnaire to the District at the time/date/location indicated here: Business Services Department, Fullerton Joint Union High School District, 1051 W. Bastanchury Road, Fullerton, CA 92833 Time: May 20, 2022 3:00 PM Any contractor that has prequalified on a District project within the past twelve (12) months may be able to satisfy the prequalification requirements for this project. Please review the Prequalification Questionnaire in the Project Documents for this Project to make that determination. Each bid must conform and be responsive to all pertinent Project Documents, including, but not limited to, the Information for Bidders. Engineer's Estimate: $1,450,000.00. This is a public works project. The successful bidder and all of its subcontractors of all tiers shall register with the Department of Industrial Relations (DIR) as a contractor that is working on a public works project and shall pay all workers on all work on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the DIR, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code (other than the companies that manufacture and deliver ready mixed concrete directly to construction sites using their own drivers, pending the final adjudication of Allied Concrete & Supply Co., v Edmund Gerald Brown J., et al., United States District Court, Central District of California, Case No. 2.16-CV-04830-RGK (FFM)**). Prevailing wage rates are available from the District or on the Internet. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a) in which circumstance the contractor or subcontractor is ineligible to respond to a bid or to do public work]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015). This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The District will conduct one (1) voluntary informational job walk (or conferences) relative to the Project. The location of the job walk /conference shall start at Troy High School, 2200 E. Dorothy Lane, Fullerton CA., 90621. Meet at the Main Office entrance. The District requires that each bidder possess the following classification(s) of contractor's license(s) at the time the bid is submitted: Bid No. Description License 2122-10 Multi-Site Parking Lot Replacement A, C12 FUHS,TRHS,SHHS & SOHS The Bidder's license(s) must remain active and in good standing at the time of the bid opening and throughout the term of the Agreement. The Project Documents are on file at the following location: Crisp Imaging. The Project Documents include the plans and specifications pursuant to which the Project is to be constructed and upon which the bidders are to base their bids. Option 1: View and/or Download from Crisp Imaging Planwell site by following these directions: o Access the site by going to Internet Explorer to connect to www.crispimg.com o Click on Planwell go to Public Planroom search by entering FJUHSD. Option 2: Purchase CD (Compact Disc) or paper bid documents by following these directions: o Send email request to planwell@crispimg.com . Reference in the e-mail title. Call helpdesk at (866) 522-8475. Ask for the Planwell Department. o Substitutions: Any product substitution must be submitted ten (10) days prior to bid opening. Inquiries about the project are to be directed to Dale McCurry, dmccurry@fjuhsd.org The District's Board has found and determined that specific item(s) shall be used on this Project based on the purpose(s) indicated in Public Contract Code section 3400(c). A full list of those items are attached to the Project Documents and can be found at Facilities and Construction / District Standards Pursuant to Public Contract Code section 22300, the Agreement will contain provisions permitting the successful bidder to substitute securities for any monies withheld by the District to ensure performance under the Agreement or permitting payment of retentions earned directly into escrow. The District shall award the Agreement, if it awards it at all, to the lowest responsive responsible bidder based on: The base bid amount only. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. Prior to the Bid Submission Deadline, any bidder may withdraw its bid in person or by written request. No bids may be withdrawn between the Bid Submission Deadline and the ninetieth (90 th ) calendar day thereafter, inclusive, and all bids shall be effective throughout that entire ninety (90) day period. Option 1: View and/or Download from Crisp Imaging Planwell site by following these directions: o Access the site by going to Internet Explorer to connect

Final Planning

Sidewalks / Parking Lot

$1,048,000.00

Public - City

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
108
Bidding Soon
2,314
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

August 8, 2022

img_map_placeholder

Multiple Locations, Fullerton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.