EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 21, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Lawrenceville, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge repairs, epoxy overlay on bridge deck, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 49, SECTION 081, in TIOGA COUNTY, LAWRENCE TOWNSHIP from approximately 2.7 miles east of the intersection of SR 49 and SR 4022 at segment 0570 offset 1315 to approximately 2.7 miles west of the SR 15 and SR 49 interchange at segment 0600 offset 1228. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Let Type: Scheduled Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge 408 Version: 2020-4 All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - SR49 Over Baldwin Creek Deck Patching *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$823,770.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Fill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
71
Bidding Soon
863
All Active Projects
414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2022

July 25, 2022

img_map_placeholder

State Rte 49, Lawrenceville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SR49 Over Baldwin Creek Deck Patching

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.