BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a civil project in Jefferson, Georgia. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The City of Jefferson is soliciting BIDS for the construction of the following project: I-85 1.0 MGD Water Reclamation Facility. This project shall include the construction of a new 1.0 MGD Water Reclamation Facility, including all civil, structural, electrical, and mechanical work necessary to construct the following unit processes: headworks, secondary treatment, secondary clarification, filters, ultraviolet disinfection, and post-aeration. Included in the solids handling are new dewatering facilities and aerobic digesters. The project scope includes modifications to the influent pump station. In addition, a 24-inch outfall pipe will convey effluent from the proposed facility to Opossum Creek. The project shall consist of furnishing all materials, labor, equipment, and any appurtenances as necessary to complete the work described within these plans and specifications.The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond, with a corporate surety approved by the OWNER and listed in the latest issue of U.S. Treasury Circular 570, each in the amount of 100% of the Bid. An Irrevocable Letter of Credit from a local, Jackson County bank is acceptable in lieu of Performance Bond and Labor and Material Payment Bond. A satisfactory Bid Bond (in the amount of 5% of the Bid), executed by the Bidder, and an acceptable surety company listed in the latest issue of U.S. Treasury Circular 570, will accompany each BID. In lieu of a Bid Bond, the City will accept a cashier's check, certified check, or cash deposit in an amount equal to at least 5% of the total contract amount. The Owner reserves the right to reject any or all Bids or to waive any informality in the bidding, to evaluate Bids, and to accept any Bid, which in his opinion, may be for his best interest.

Bid Results

Water / Sewer

$21,904,460.00

Public - City

New Construction, Renovation, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
93
Bidding Soon
1,531
All Active Projects
658
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2022

July 14, 2022

img_map_placeholder

I-85, Jefferson, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.