Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition and site work for a municipal facility in Greenville, Illinois. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.
The City of Greenville is accepting proposals for demolition of commercial property located at 102 and 104 W. South St., Greenville Illinois. Project involves two commercial buildings that are connected, approximately 6800 square foot total. Structures contains an unknown, presumed partial basement. Foundation and basement walls are of concrete and/or block construction. Will include removal approximately 30' of private and approximately 48' of city sidewalk. There will be no pre-bid interior inspections Proposed Project Description A. Complete demolition and removal of entirety of all structures, including basement(s), footings, 20 feet of private sidewalk on the north side of building and 48 feet of city sidewalk on the east side of building. B. City sidewalks on the north side of building, to be preserved or replaced. C. Disconnection and appropriate capping off of all utilities. D. Removal and disposal of all fencing, brush, and/or landscaping on property, grass/yard and mature trees excluded. E. Removal and disposal of any and all outbuildings/storage sheds on property. F. Backfill of all disturbed areas of site with suitable clean fill dirt with compacting and leveling for final grade. No construction material is allowed as fill. G. Complete removal and disposal of all debris. Debris must be disposed of in accordance with all State, Federal, and local laws. Project is contingent upon the approval and award by the Greenville City Council. The work shall be completed within 90 days from the date when the bid is approved. Contractor Requirements A. It is the responsibility of the contractor to become familiar with the nature and scope of the project and property detailed. B. Contractor must maintain adequate levels of insurance, including workers compensation coverage. C. Contractor must ensure qualified personnel are assigned to the project. D. Contractor must be capable of meeting time constraints and project bid price. E. All work shall be completed in accordance with all Federal, State, and local laws. F. Contractor must adhere to prevailing wage, if applicable Questions should be directed to Jeff Ketten at 618-606-1161 The City of Greenville reserves the right to reject any and all bids, and to waive irregularities in the bids. City may interview a firm if deemed necessary. Proposal will be pre-awarded by the Greenville City Council to the most qualified firm whose proposal is deemed most advantageous to the City, all factors considered. Unsuccessful firms will be notified as soon as possible.
Post-Bid
Municipal
$50,000.00
Public - City
Demolition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2022
July 29, 2022
Multiple Locations, Greenville, IL
Related To This Project
Greenville, IL
Bid Date: Jun 03 2022
Greenville, IL
--
Greenville, IL
Bid Date: Jun 02 2022
Greenville, IL
Bid Date: Aug 02 2022
Greenville, IL
Bid Date: Aug 19 2022
Greenville, IL
Bid Date: Dec 06 2022
Greenville, IL
Bid Date: Dec 06 2022
Greenville, IL
--
Greenville, IL
Bid Date: Feb 01 2023
Greenville, IL
Bid Date: Apr 06 2022
Greenville, IL
Bid Date: Apr 06 2022
Greenville, IL
Bid Date: Apr 21 2022
Greenville, IL
Bid Date: Jan 20 2023
Greenville, IL
Bid Date: Oct 28 2022
Greenville, IL
Bid Date: Oct 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.