BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Saginaw, Michigan. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of October 4, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, project letting is not expected to start prior to December of 2023 and construction is not expected to start prior to May of 2024. *The closed solicitation has been included below for reference: The Saginaw County Road Commission (SCRC) is requesting proposals for Engineering Services for the design of a Federal Aid Project within Saginaw County. For scheduling purposes and a design timeline, the project should be submitted to the Michigan Department of Transportation in anticipation of December 2023 letting date. This Road project includes the design of approximately 2 miles of roadway improvements through Carrollton Township. Michigan is primarily a 2 lane NHS Route Other Principle Arterial carrying approximately 8560 vehicles per day. The project shall be designed according to 3R/4R standards and in accordance with a typical MDOT Federal-Aid project. Our vision of the project is a to mill & fill approximately 3.5" with two lifts of HMA. The project limits should include the entire Shattuck Road Intersection. The south bound concrete portion north of Weiss is not part of this project. The existing road is Curb and Gutter. Some curb will require replacement and all sidewalk approaches will need to meet ADA requirements. We believe the project can be designed using a Log Job and some special details. The RR crossing was recently re-constructed and it is anticipated that the roadway between the rails will be left in place but the approaches will be redone to provide a smooth transition. Coordination with the RR will be needed but we do not anticipate any work will be needed to be completed by the RR. Any easements determined necessary throughout the course of design would be considered an additional service and the cost for which would be negotiated during the course of the design project. For purposes of clarifying the scope, it can be assumed that there will be no easements that will need to be obtained at this time. The Saginaw County Road Commission, through its MPO has allotted a construction budget of $ 312,500 for the mill and fill project. The design shall follow a critical path to meet a proposed letting date no later than December 2023. The estimated start of construction likely be May 2024. All questions regarding this RFP shall be submitted in writing to Dan Armentrout via email. The last day for written questions to be submitted to the SCRC will be June 16, 2022 Award of the contract will be on or near June 28, 2022 The method of Contractor Selection has not been Determined at this time

Conceptual

Roads / Highways

$312,500.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
155
Bidding Soon
1,935
All Active Projects
758
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 1, 2024

img_map_placeholder

Multiple Locations, Saginaw, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.