BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a civil project in Darlington, South Carolina. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.

2,431' of 8" & 10" sewer pipe bursting, MH rehab, remove and replace 841' of 8" & 10" gravity sewer, install 686' of new gravity sewer, 12 new MH, rehab pump station, asphalt replacement. Funded by CDBG. Bidders must comply with Federal requirements, Davis-Bacon Act, Anti-Kickback Act, EEO, & Section 3. Minimum wage rates apply. Bid bond, P&P bonds required. $150 for electronic plans, specs, & bid package. The scope of work includes pipe bursting approx. 2,431 lf of 10" & 8" sewer pipe, rehab manholes, remove & replace 841 lf of 8" & 10" gravity sewer with manholes, install 686 lf of new 8" gravity sewer, and rehab an existing pump station. This project is being funded in whole or in part by the Community Development Block Grant Program (CDBG). All federal CDBG requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Bidders on this work will be required to comply with the President's Executive Order No. 11246 & Order No. 11375 which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Title VI if the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and 40 CFR 33.240. The CDBG application, including the cost estimate, is available for review at the engineer's office. Bidders must make positive efforts to use small and minority-owned business and to offer employment, training and contracting opportunities in accordance with Section 3 of the Housing and Urban Development Act of 1968. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. The Owner reserves the right to waive any irregularities, or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening. Estimated cost is $750,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $750,000 - $850,000

Post-Bid

Water / Sewer

$850,000.00

Public - City

Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
68
Bidding Soon
901
All Active Projects
443
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

September 29, 2022

img_map_placeholder

Multiple Locations, Darlington, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.