BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Kirby, Arkansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed work is located in Graham County on US70 between mileposts 279.50 and 293.40 near Peridot on the San Carlos Apache reservation. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a Bonded Wearing Course overlay. The project also includes spot repair work by milling and replacing with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work. AZDOT - Globe-Lordsburg Highway (US 70) (Tribal Rd 420 - Coolidge Dam R)

Bid Results

Roads / Highways

$7,639,743.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
21
Bidding Soon
322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

August 23, 2022

Project location map

US-70, Kirby, AR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.