Renovation of a water / sewer project in Crest Hill, Illinois. Completed plans call for the renovation of a water / sewer project.

As of July 29 the project is anticipated to be awarded on November 1,2022 . The Project includes the following Work: Increasing the capacity of the West Sewage Treatment Plant from a current design average flow (DAF), design maximum flow (DMF), and peak hourly flow (PHF) of 1.3 million gallons per day (mgd), 3.0 mgd, and 9.0 mgd, respectively, to a DAF, DMF, and PHF of 2.2 mgd, 5.5 mgd, and 13.8 mgd, respectively. Expansion includes a new Headworks Complex with mechanically-cleaned fine screening, influent flow metering, influent pumping, and primary clarification; new aeration tanks; two new final clarifiers; replacement of existing sand filters with new cloth disc filters in the existing Filter Building; new ultraviolet disinfection and post aeration; and new plant outfall. Improvements also include one new Excess Flow Clarifier, liquid chlorine excess flow disinfection, and sodium bisulfite dechlorination; a new Blower Building housing blowers, chemical phosphorus removal facilities, and return activated sludge pumping; a new Administration Building; conversion of the existing aeration tanks to aerobic digesters; demolition of the existing Administration Building and Anaerobic Digestion Complex; and miscellaneous piping, mechanical, heating, and air conditioning, electrical, supervisory control and data acquisition, and site improvements. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. Bidders will be required to comply with all laws, including those relating to the employment of labor and the payment of the general prevailing rate of hourly wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract or perform such work, also the general prevailing rate for legal holiday and overtime work (including, but not necessarily limited to 820 ILCS 130/1-12 the "Prevailing Wage Act") as ascertained by the City or by the Illinois Department of Labor for Will County, Illinois shall be paid for each craft or type of worker needed to execute the contract or to perform such work. If at the time this Contract is executed, or if during the term of this Contract, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act, 30 ILCS 570, as two consecutive months of unemployment exceeding 5%, CONTRACTOR agrees to employ a work force that consists of at least 90% Illinois laborers. An "Illinois laborer" is defined as any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. The Bidder shall require all subcontractors (if any) to conform with said laws, and any rules or regulations now and thereafter issued pursuant to said laws by Bidder, his subcontractors, and/or anyone working through or on behalf of Bidder or Bidder's subcontractors. Any Contract or Contracts awarded under this Advertisement to Bid are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this Advertisement to Bid or any resulting contract. The Contract award will be subject to regulations contained in the Procedures for Issuing Loans from the Water Pollution Control Loan Program (35 IAC Part 365), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), IL Works Jobs Program Act (30 ILCS 559/20.1), and the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, The Consolidated Appropriations Act, 2014. This Contract award is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. The City of Crest Hill reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 140 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder.

Bid Results

Water / Sewer

$51,770,000.00

Public - City

Renovation

245

44

30

9

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Fibrous Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment, Concrete Topping, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Clocks, Rugs and Mats, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Sump Pump Discharge Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Low-Voltage Circuit Protective Devices, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition, Airfield Signaling and Control Equipment, Weather Observation Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment, Liquid Process Equipment, Liquid Aeration Devices
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
185
Bidding Soon
2,219
All Active Projects
1,085
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

August 15, 2022

img_map_placeholder

To Be Determined, Crest Hill, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

West Sewage Treatment Plant Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.