Site work and paving for a sidewalk / parking lot in San Francisco, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project primarily involves renovating and re-paving the pedestrian pathway around the perimeter of Stow Lake in Golden Gate Park located in San Francisco. This pedestrian pathway is one of the many features unique to the world-famous Golden Gate Park. This project will improve usability and accessibility of the existing asphalt pathway that is used and enjoyed by the public daily. Site improvements include but are not limited to demolition, grading, compaction, asphalt paving, concrete paving, refurbishing of existing site furnishings, installation of new site furnishings, signage. The perimeter path work around Stow Lake shall be completed in two separate construction phases to allow for public access to at least half of the perimeter path at all times. This project also includes repaving the existing asphalt parking lot at the Stow Lake Boathouse and re-paving an existing asphalt path at 36th Ave and Spreckels Lake Drive 276 consecutive calendar days from NTP to substantial 1) Class "A" license required to bid. 2) Pursuant to San Francisco Administrative Code ("Administrative Code") Section 6.25 and Chapter 25 of the Environment Code, "Clean Construction" is required for the performance of all work. 3) Bid discounts may be applied as per Administrative Code Chapter 14B. 4) LBE Subcontracting Participation Requirement is 20% LBE. 5) Good Faith Efforts. In accordance with Administrative Code Chapter 14B requirements, all bidders shall submit documented good faith efforts with their bids, except those who exceed the above stated LBE subcontracting participation requirement by 35%. Bidders must achieve 80 out of 100 points to be deemed responsive. Bidders will receive 15 points for attending the pre-bid conference. For details, contact Ivan Oldenkamp by phone at (415) 515-6793 or by email at Ivan.Oldenkamp@sfgov.org. 6) For information on the City's Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com. 7) This Project shall incorporate the required partnering elements for Partnering Level 2.

Bid Results

Sidewalks / Parking Lot

$1,523,500.00

Public - City

Paving, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
46
Bidding Soon
1,788
All Active Projects
755
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

August 15, 2022

img_map_placeholder

To Be Determined, San Francisco, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.