Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, outdoor lighting and new construction of a mixed-use development in Fort Rucker, Alabama. Completed plans call for the construction of a fitness / recreation center; 124,900-square-foot military facility; 1,000-square-foot military facility; for site work for a fitness / recreation center; military facility; road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
DESCRIPTION OF WORK In general, the work shall consist of the following: Construction of an Advanced Individual Training (AIT) Complex that includes a 24,000 SF 800-PN dining facility, a 10,900 SF battalion headquarters, a 90,000 SF modified standard enlisted barracks for 300 soldiers with attached company operations facilities (COF) and covered training area, a 1,000 SF detached storage facility, a multipurpose training athletic field, Intrusion Detection System (IDS) installation, and Energy Monitoring and Control System (EMCS ) connection. Sustainability and energy enhancement measures are included. The North American Industry Classification System (NAICS) code for this project is 236220. NOTE: The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. The cost of this work is estimated to be between $25,000,000 to $100,000,000. of Paragraph 8. REQUIRED INSURANCE The Contractor shall procure and maintain during the entire period of his performance under this contract, the following minimum insurance in accordance with the Contract Clause entitled "Insurance-Work on a Government Installation." Workmen's Compensation and Employers' liability Insurance: Workmen's Compensation and Occupational Disease Coverage in accordance with statutory limits. Employers' Liability Coverage with a minimum limit of $100,000. Comprehensive Automobile Liability Insurance: Bodily injury coverage with minimum limits of $200,000 per person and $500,000 per occurrence. Property Damage Coverage with a minimum limit of $20,000 per occurrence Comprehensive General Liability Insurance: Bodily injury coverage with minimum limits of $500,000 per occurrence. of Paragraph 9. CONTRACTOR PAYMENT REQUEST A copy of CESAM Form 1151 entitled Prompt Payment Certification and Supporting Data for Contractor Progress Payment Invoice is included hereinafter, with instructions, following the Wage Rates. This form will be used in conjunction with the contract clause entitled PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS. The contracting Officer will provide copies of the form to the Contractor upon request. The Contractor shall complete the form, sign the certification and submit it with each progress payment invoice. of Paragraph 10. KEY PERSONNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR Any key in-house personnel, subcontractors and outside associates or required by the Contractor in connection with the services covered by the contract will be to individuals or firms that were specifically identified and agreed to during negotiations. The Contractor shall obtain the Contracting Officer's written consent before making any substitution for these designated key personnel, subcontractors, associates, or . *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Military
$91,617,356.00
Public - Federal
New Construction, Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2022
March 31, 2023
To Be Determined, Fort Rucker, AL
Related To This Project
Fort Rucker, AL
Bid Date: Sep 15 2022
Fort Rucker, AL
Bid Date: Feb 03 2023
Fort Rucker, AL
--
Fort Rucker, AL
Bid Date: Jan 04 2024
Fort Rucker, AL
--
Fort Rucker, AL
Bid Date: Jun 04 2019
Fort Rucker, AL
Bid Date: Jul 21 2023
Fort Rucker, AL
Bid Date: Oct 24 2023
Bay Minette, AL
Bid Date: Jul 11 2022
Mobile, AL
Bid Date: Jan 22 2020
Guntersville, AL
--
Lighting Renovations for Hewitt-Trussville Middle School and Hewitt-Trussville High School - 4757522
Trussville, AL
Bid Date: Jul 12 2022
Fyffe, AL
Bid Date: Feb 25 2022
Saraland, AL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.