EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Middlesex, New Jersey. Completed plans call for site work for a road / highway; and water / sewer project.

Contract Award Date: Mar 15, 2023 Contract Award Number: W912DS23C00005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JNJ1HM9EGGM8 Contractor Awarded Name: CARBRO CONSTRUCTORS CORP Contractor Awarded Address: Warren, NJ 07059 USA Base and All Options Value (Total Contract Value): $54,708,595.00 The U.S. Army Corps of Engineers, New York District is issuing an Invitation for Bid (IFB) for Segment C2 and H Contract 2 of the Green Brook Flood Risk Management Project located in Middlesex Borough in New Jersey consisting of the construction of the Segment C2 component of the project along Bound Brook includes two (2) pump stations, 1,700 ft of earthen levee, 100 ft floodwall and one (1) road closure gate. The Segment H component of the project along Bound Brook includes 3,600 ft of earthen levee which ties into a railroad embankment, 576 ft floodwall and one (1) road closure gate. Project magnitude is between $25,000,000 - $100,000,000. This project solicitation will be unrestricted full and open competition with HUBZone preference. The period of performance for this project is 730 calendar days from the Notice to Proceed date. The specifications will be posted electronically via the Contract Opportunities website at https://sam.gov/. PLEASE NOTE: www.fbo.gov IS NOW https://sam.gov/. The applicable North American Industry Classification System (NAICS) code is 237990 for General Contractors - Heavy Construction. All questions must be submitted in writing via email to the Contract Specialist. The media selected for the issuance of this solicitation and amendments shall solely be at the discretion of the Government; accordingly, the medium utilized for this project is the Internet. Paper copies of this solicitation, and amendments, if any, will not be available or issued. In accordance with DFARS 252.204-7007, all vendors who want access to the solicitation must be registered with System for Award Management (SAM), located at https://www.sam.gov/portal/public/SAM/, and Contract Opportunities, located at https://sam.gov/, in order to safeguard acquisition related information for all Federal Agencies. Interested parties may download and print the solicitation at no charge from the Contract Opportunities website at https://sam.gov/. The Office of the Under Secretary of Defense (Acquisition Technology & Logistics (OUSD{AT&L}) A Guide to Collection & Use of Past Performance Information dated 2003 and FAR Part 36 requires the collection and use of past performance information (PPI) in acquiring best-value goods and services. FAR Subpart 36.3 and DFARS Subpart 236.2 mandates the use of Construction Contractor Appraisal Support System (CCASS) by all DoD agencies for construction contracts greater than or equal to $650,000 or more than $10,000 if the contract was terminated for default. CCASS is a module of the Contractor Performance Assessment Reporting System (CPARS) and is located at http://www.cpars.csd.disa.mil. Point of Contact is Monica Chahary, Contract Specialist, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, New York, NY 10278-0090. Phone: 917-790-8182. Email: monica.c.chahary@usace.army.mil NOTE: Please submit RFIs to both monica.c.chahary@usace.army.mil & elena.manno@usace.army.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$54,708,595.00

Public - Federal

Site Work

513

26

138

9

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Temporary Storm Water Pollution Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Post-Tensioned Concrete, Concrete Curing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Ceilings, Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Sewerage Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Commissioning of Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Watering, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection, Revetments, Waterway Construction and Equipment, Waterway Structures, Floodwalls
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Hooks, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
283
Bidding Soon
5,198
All Active Projects
2,151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

March 21, 2023

img_map_placeholder

To Be Determined, Middlesex, NJ

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Green Brook Flood Risk Management Reduction Project, Segment C2 and H

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.