BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Myrtle Beach, South Carolina. Working plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of 7/8/2022, project has been cancelled due to lack of funding. There are no immediate plans for rebidding. Construct two (2) pre-engineered manufactured pedestrian bridge foundations. If contaminated groundwater is encountered, work should be halted and the contractor shall notify the Owner, the Engineer, and SCDHEC immediately to allow evaluation of conditions by the Engineer, or his agent, and SCDHEC. No groundwater should be pumped, bailed, or otherwise discharged from the excavation. Any equipment or materials which come in contact with groundwater should not be removed from the immediate work area until potential levels of contamination have been assessed. 2. The proposed line being laid should be immediately sealed to prevent potentially contaminated water from flowing into the pipe. All workers should leave the excavation. Any equipment or other articles which have come into contact with the groundwater should be flushed with fresh water. 3. Samples of the groundwater will be collected by the engineer or his agent for testing. The constituent to be determined in the testing regime will be based upon the location with respect to the currently identified SWMUs (Solid Waste Management Units). Testing could include but is not limited to hydrocarbons, solvents, heavy metals, herbicides and pesticides. A work stoppage of 3 days should be anticipated for each such event. 4. If no contaminants are found, work can proceed. The volume of groundwater pumped from the excavation should be minimized. The engineer or his agent will sample periodically to determine if contamination is being transported from the SWMUs to the excavation via groundwater movement. 5. If the contamination is detected in the groundwater, any water removed from the excavation must be properly collected and stored for treatment. This collection will be undertaken by a qualified environmental contractor retained and paid for by the owner.

Final Planning

Bridges / Tunnels

$751,500.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
44
Bidding Soon
521
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

January 9, 2023

img_map_placeholder

Multiple Locations, Myrtle Beach, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.