BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Big Bear Lake, California. Contact the soliciting agency for additional information.

The City of Big Bear Lake - Department of Water and Power (DWP) is requesting proposals from qualified consultants to conduct a comprehensive cost of service and rate study (Study) for water service, and evaluation of capacity charges, meter installation fees, and administrative fees. Due to reductions in debt service requirements and rate-funded capital improvements identified in the 2020 Water Master Plan, the DWP requires the preparation of this comprehensive water rate study to assess and evaluate the DWP's current revenue requirements, water cost of service, and rates. In addition, the study may establish a new rate structure(s) to adequately balance the short and long-term financial and environmental sustainability of the DWP's water operations, in light of declining water consumption due to state-imposed production reduction requirements. It is also expected that the selected consultant will thoroughly evaluate the DWP's existing rate structure, operating costs, debt service requirements and capital expenditure needs. Additionally, they will work with the DWP's key management staff to explore alternative customer classifications. Of utmost importance is minimizing any hardship to the DWP's customers while maintaining both the highest quality water service and the DWP's financial stability. The overall goal of the Study is to provide a defensible 5-year water service rate schedule and a projected rate plan for an additional 5-year period. Water rates must be implemented in July 2023, after approval of the Board of Commissioners, completion of the Proposition 218 protest period procedures, and finally, adoption by the City Council. Additionally, the DWP last evaluated Capacity Charges in August 2009. The DWP requires preparation of a study of the appropriate capacity charges to ensure compliance with California statutes relating to system development fees. See the Background on Capacity Charges for more information. The DWP requires a cost-of-service analysis for meter installation fees. These fees have been escalated annually based upon changes in the construction cost index. The DWP internally developed a cost-of-service analysis for administrative fees and penalties in 2014. These fees have not been reevaluated as internal processes have changed, and labor costs have increased. The DWP requires a cost-of-service analysis for these fees. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
68
Bidding Soon
1,323
All Active Projects
634
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

img_map_placeholder

Multiple Locations, Big Bear Lake, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.