Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 6, 2023 at 7:00 PM
Updated January 27, 2024
Site work and paving for a road / highway in Springfield, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of December 6, 2023, per owner, the project is currently under construction. Job No: J8P3032C, J8P3032D, J8P3201, J8P3223, JSU0106, & JSU0044 Location: Route 60, Greene County Proposed Improvement: This project entails the expansion of James River Freeway to 6 lanes from National Avenue to Kansas Expressway and widening bridges A4182 and 4183 over Campbell Avenue. Also, includes projects let in partnership with City of Springfield which includes improvements to the intersection of Campbell and Republic Road and improvements on Republic Road east of the intersection. Length: 2.07 Miles Approximate Construction Cost: $19.538 Million DBE Goal (if applicable) 0% The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Route 60, Construction and Materials Testing Expansion of James River Freeway to 6 lanes
Under Construction
Roads / Highways
$19,538,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2022
US-60, Springfield, MO
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
