BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in San Bruno, California. Completed plans call for the renovation of a educational facility.

San Mateo County Community College District ("District"), acting through its Governing Board, hereinafter referred to as the District, will accept electronically submitted bids for the award of the contract for the following public work: Sky B3/7 Exhaust Fan and B7 HVAC Split Units Replacement The Work generally consists of replacing exhaust fans EF-1D, EF-2D, EF-3D, EF-4D, EF-7D, EF-8D and associated sound attenuator, ductwork, damaged electrical conduit, cables, etc. in the roof of Building 3; replacing exhaust fans EF-7-1, EF-7-4 and associated ductwork in the roof of Building 7; and replacing the condensing units, line sets, TXVs, solenoid valves and evaporator coil associated with the AC units CU-7-1 (AHU-7-1) and CU-7-2 (AHU-7-2) in Building 7. Each bid must conform to and be responsive to the contract documents and be submitted on a form furnished by the District. The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. Each Bidder submitting a bid, including all Bidder's Subcontractors, must be a Department of Industrial Relations Public Works registered contractor pursuant to Labor Code 1725.5 As a limitation on Bidder's privilege to substitute "or equal" items, District has found that certain items are designated as District standards and certain items are designated to match existing items in use on a particular public improvement either completed or in the course of completion or are available from one source. As to such items, District will not permit substitution. Such items are described in the Bidding Documents. Last Day to Submit RFI's - Wednesday, May 18, 2022. -Remove existing ductwork and sound attenuator in the roof and replace with same size new ductwork and sound attenuator -Remove existing exhaust fans and install new exhaust fan of same capacity size and motor HP. the Local disconnects and conduit (including wire) need to be replaced as well. Reconnect to existing electrical power and control system. Adjust and balance fan and dampers to deliver cfm

Bid Results

Educational

$1,445,059.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
48
Bidding Soon
1,739
All Active Projects
736
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.