BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Virginia Beach, Virginia. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Description:Contractor shall furnish all material, labor, equipment, and supplies required to disassemble existing quonset hut building located at Chesapeake Elizabeth Treatment Plant, transport it to Onancock Plant, demo the dewatering building, and assemble the quonset hut all in accordance with the attached specifications, requirements, line item descriptions, terms and conditions. *NOTE: Do not respond through eVA. HRSD only accepts responses submitted online through HRSD's Online Oracle ERP system. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Scope of work: - Contractor will begin by dismantling existing Quonset hut at Chesapeake Elizabeth (CE) Treatment Plant. - Contractor will supply labor and equipment to dismantle the metal building. - The building panels will be labeled by contractor so it may be erected in same condition at a later date. - Contractor will remove all lights, electrical fixtures, wiring, and conduit, all associated electrical fixtures and wiring (lights/heaters, etc.) will be saved to reassemble at a later date. - Contractor will remove overhead doors and framework and place all material on pallets to be transported to Onancock (ON) Treatment Plant. - Contractor will cut off all anchors at the concrete (the main electrical will be disconnected by others). - All equipment that is stored in the building will be removed by others. - All work to be completed during regular business hours. CETP hours are M - F 6:00 am to 3:30 pm. ON hours MF 8:00 am to 5:00 pm. - Building will be placed on dunnage at Onancock treatment plant by contractor. Storage area of items must be coordinated with plant staff. - Once all parts for erection of Quonset hut are on-site at Onancock Treatment Plant, then the next phase can begin. - Dismantle existing Dewatering building. - Contractor will supply labor and equipment to demo the existing wooden structure and dispose of it in ownersupplied dumpster. - Owner will disconnect the electrical and other utilities. Contractor will leave electrical service panel and Belt press in operating condition. Electrical service panel must be supported and protected from elements. - All work to be completed during regular business hours. CETP hours are M - F 6:00 am to 3:30 pm. ON hours MF 8:00 am to 5:00 pm. - Contractor will need to supply concrete and labor to install appropriate rebar and pour a pad to accommodate the footprint of new Quonset Hut. (Foundation Plan on Page 2) - Contractor will install Quonset Hut on existing concrete pad at ON and will need to increase the size of the concrete pad to match the foundation plan provided. - Contractor will use chemical anchors to properly secure Quonset Hut to the existing pad in the designated areas as laid out in Foundation Plan. - Contractor will supply labor, equipment, and materials necessary to erect the building that was removed from CE in Virginia Beach. Fasteners in good condition can be reused, replace fasteners deemed unacceptable for reuse. - Panels will be installed correctly in the same places that they were removed from. - Install end walls and doors. - Install lighting and all associated electrical fixtures. - Main power will be connected by others. - Building will be anchored to the existing concrete pad. - All work will be completed during regular business hours, CETP hours are M-F 6:00 am to 3:30 pm. ON hours are M-F 8:00 am to 5:00 pm and must be completed within two weeks (10 business days). Multiple Locations Are Available In This Project.

Post-Bid

Water / Sewer

$390,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
18
Bidding Soon
378
All Active Projects
145
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

June 23, 2022

img_map_placeholder

Multiple Locations, Virginia Beach, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.