BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Walled Lake, Michigan. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of 06/10/2022 This project will be rebid. Installation of a bioswale, replacement/relocation of concrete walkway, segmental retaining wall, park benches, picnic tables installation of light pole fixture assemblies and associated electrical appurtenances, stamped concrete, pedestrian access ramps, landscaping and related restoration. Work for this project shall consist of installation of a bioswale, replacement/relocation of concrete walkway, segmental retaining wall, park benches, picnic tables installation of light pole fixture assemblies and associated electrical appurtenances, stamped concrete, pedestrian access ramps, landscaping and related restoration, and other miscellaneous items in conformance with the bid documents in and adjacent to Mercer Beach in the City of Walled Lake (City). Work shall commence on June 22, 2022 and have final completion no later than August 26, 2022. OWNER may consider an earlier start date. Contact the ENGINEER by Monday, May 23, 2022 at 5pm for consideration. If the OWNER determines and earlier start date is in their best interest, related information will be provided in an addendum. This project is funded by the OWNER. State or federal funds are being used to assist in construction and relevant State or federal requirements will apply. The Contractor and Subcontractors on this project must comply with all applicable local, state, and federal requirements. The City of Walled Lake is an equal opportunity employer and all businesses are strongly encouraged to bid. The right is reserved by OWNER to accept or reject any and all Bids, and to waive irregularities in bids. No Bids may be withdrawn after the above date and time for receiving Bids for a period of sixty (60) days. . The Work shall commence on June 22, 2022 and shall be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions by August 26, 2022 MBE: 10.00% WBE: 7.50%

Final Planning

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
78
Bidding Soon
1,412
All Active Projects
574
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

December 9, 2022

img_map_placeholder

Multiple Locations, Walled Lake, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.