BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Tempe, Arizona. Completed plans call for site work for a municipal facility.

Alumni Lawn Rehabilitation Deadline for Inquiries 5:00 PM, MST, 5/25/2022 Alumni Lawn Rehabilitation - Phase One is comprised of 2.7 acres of improvements at the Alumni Lawn on University Drive defined by the driveway to Health Services on the east and Cady Mall and Durham Hall to the west. The southern boundary of the initial phase will the turf edge at the north side of the fountain. Site Background Information a. The entire site is located within the historic heart of the Tempe Campus. The master plan of the site reflects the programming of the user groups and has been done and approved by MRO, it is approximately 8.2 acres in size. The plan will address all aspects of Landscape Architecture (site development, hardscape, plantings and irrigation) and must reflect the Design Aspirations of the University. b. A primary goal of the phasing effort will be to have a completed design for Durham Hall at the completion of the current renovation. The goal of the current renovation project will be to have a completed project that will encompass the east side of Durham Hall to the west facade of the University Club, from Tyler Mall to the ROW of University. Tenant Improvements will be phased and Phase One will include the following: o Preparing applicable construction documents that illustrate the removal of existing trees and plant materials, removal and salvage of the existing pavers where feasible and existing irrigation system. New improvements will include a campus monument signage including the University seal parallel to University Drive, paving that meets the ASU guidelines for vehicular movement, a restored sun dial, relocation of the Philomathian and Martin Puryear benches, relocation and enhanced bases of the existing pedestrian pole lighting, bollards, bike racks, event and convenience power outlets per the program, plantings, cost estimation and Guaranteed Maximum Price (GMP

Post-Bid

Municipal

$4,930,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
14
Bidding Soon
690
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.