BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Site work for a bridge / tunnel in Barrie, Ontario. Design plans call for site work for a bridge / tunnel.

Whiskey Creek Culvert and Channel Improvements in the Whiskey Creek floodplain from the outlet at Kempenfelt Bay to just upstream of The Boulevard to Brennan Avenue . Key considerations of the assessment include impacts to property, existing infrastructure, emergency access, transportation routes, and natural heritage. The existing washroom/generator building must be relocated, to remove it from erosion hazard associated with Whiskey creek and to reduce the frequency of the building floods. A replacement of the washroom/generator building is planned in the short-term. TIMELINE: Designs are underway. A replacement building is planned in the short-term (1-5 years). Pre-construction works targeted in 2027. Construction is currently targeted 2028/2029.

Design

Bridges / Tunnels

$10,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
164
Bidding Soon
4,071
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.