BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Port Perry, Ontario. Design plans call for site work for a bridge / tunnel.

Two (2) timber bridge replacements within the Region of Durham: Nonquon Bridge (Site ID 008006) and Smith Bridge (Site ID 011003). TIMELINE: Updates on design will not be released at this time. Construction for Nonquon & Smith Timber Bridges is not expected until 2024. Further update spring 2024.

Design

Bridges / Tunnels

$3,410,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
435
Active Projects
232
Bidding Soon
4,415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2024

Project location map

Multiple Locations, Port Perry, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.