Published July 12, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

Roof Renovation Performance Period: 548 Continuous Calendar Days (See Page CC-3 and Appendix B) Liquidated Damages: Fifteen Hundred ($1,500) Dollars per Continuous Calendar Day and as set forth in the Construction Contract Page CC-3 and Appendix B SCA system-generated category: $0 to $250,000 (not to be interpreted as a "bid range") $250,001 to $500,000 $500,001 to $750,000 $750,001 to $1,000,000 $1,000,001 to $4,000,000 $4,000,001 and Above INSURANCE See specific Contractor-furnished insurance requirements and SCA-furnished Insurance Coverage, Builder's Risk Coverage and Deductibles, the Owner Controlled Insurance Program (OCIP). The OCIP Manual is available electronically. Please make sure that you are prequalified to perform work greater than One Million ($1,000,000) Dollars if your bid is in excess of $1,000,000 and that your firm have the applicable experience for this scope of work as of the bid opening date and time. BID BREAKDOWN:Upon request, the apparent low bidder for this project will be required to submit to the SCA its bid breakdown using a Project Specific Template, within seventy-two (72) hours of the bid opening or when requested. BID BOND - Bonds are being processed via Surety 2000 A Bid Bond prepared on the form attached to the Construction Contract as Appendix C or a Certified Check of the Bidder for five (5%) percent of the Bid Amount must accompany the Lump Sum Bid Form. A "Wicks" subcontractor is defined as a subcontractor performing construction work in the HVAC, Plumbing & Gas Fitting or Electrical Trades and (except for HVAC) licensed to do business in the CITY OF NEW YORK in that trade. The SCA has determined that the work under this solicitation involves Plumbing & Gas Fitting Work. All proposed "Wicks" trade subcontractors must be prequalified by the SCA. However, said firm must not be "disqualified", "suspended", or "ineligible", at the time of Bid Opening. Therefore, the Bidder must include with its bid, and in accordance with the Information for Bidders Section, the names of all its proposed "Wicks" trade subcontractors and estimates for each of the trades listed in the previous sentence. The Bidder must complete and submit with its bid the "Wicks" Subcontractor Request Form. (Appendix G). Pursuant to the SCA's authorizing legislation, contracts will only be awarded to contractors prequalified by the SCA. If the Bidder is not prequalified at the time of the bid opening its bid will not be accepted. Please check all three (3) lists (disqualified, suspended, and otherwise ineligible) when conducting a search to obtain the complete prequalification status of a firm appearing on the SCA's electronically. Bidders can ensure their eligibility for contract award by verifying that they are currently prequalified. All inquiries regarding prequalification status should be directed to the SCA's Prequalification Dept. at (718) 472-8777. All questions by prospective bidders concerning this solicitation should be directed, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date to Mr. Vish Persaud, at E-mail: vpersaud@nycsca.org, Phone Number: (718) 752-5935. As a condition of award under this Solicitation, the SCA will require the lowest responsive, and responsible bidder and its subcontractors of any tier performing Work on this project to become signatory to, and be bound by, the provisions of the Project labor Agreement (PLA) newly executed on the 25th of August, 2020. The PLA applies to the Work performed under this solicitation and bids must be prepared in compliance with the PLA. The PLA can be accessed electronically, click on Project Labor Agreement, and then see below for Project Labor Agreement covering Fiscal Years 2021 - 2025. The Bidder is required to execute a PLA Letter of Assent (in the form of Appendix L to the Construction Contract) pursuant to which it agrees to become signatory to, and abide by, the provisions of the PLA. This PLA Letter of Assent will be issued at the time of the Notice of Intent to Award letter. The Bidder must sign and return this document to the SCA along with the required Construction Performance and Labor and Material Payment Bonds. Failure to submit this PLA Letter of Assent will render the Bidder to be non-responsive and therefore, ineligible for award of a contract under this solicitation. QUESTIONS REGARDING THE CURRENT PLA SHOULD BE DIRECTED TO DEBORAH SEIDENBERG, SENIOR DIRECTOR OF LABOR LAW COMPLIANCE, AT EMAIL: DSEIDENBERG@NYCSCA.ORG OR TELEPHONE NUMBER: (718)472-8496. M00708773-I1

Award

Educational

$2,525,000.00

Public - City

Renovation

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Mockups, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Membrane Roofing, Fluid-Applied Roofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Metal Furring, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment, Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Radiators
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Hooks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
346
Bidding Soon
5,354
All Active Projects
2,254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 4, 2022

img_map_placeholder

444 W 56th St, New York, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Roof Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.