BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for an educational facility in Montreal, Quebec. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Upgrades, repairs and redevelopment of the University Pavilion for the reallocation of the spaces became free on the site de la Montagne. The project will allow to free up rental study spaces at 7077 avenue du Parc, regroup the Health pole and administrative units with functional links in the Roger-Gaudry pavilion, create living spaces for students, reduce physical obsolescence of facilities by major renovations. The scope of the project 78100 includes demolition and partial alteration work. Reference number : 1605376 Deadline for receipt of complaints: 2022-06-01 Submission sent electronically accepted: Yes, in a single submission document Expected duration of the contract without the options (in months): 4 Value of the Bid Security (amount or percentage) Ten percent (10%) of the price of the bid as indicated in the "Price Submission Form" (DSUM-4FS-1). Description The Universite de Montreal is issuing a call for tenders in order to retain the services of a general contractor for deconstruction work to be carried out at the Pavillon Roger-Gaudry Est located on its mountain campus . Project : The work covered by this Contract is part of the Global Project for Reassigning the spaces of the Roger-Gaudry and Marie-Victorin Pavilions, located on the mountain campus of the University of Montreal. This contract only covers floors 7, 8 and 9 of the East sector of the Roger-Gaudry Pavilion. It targets project 78100 - Deconstruction and preparatory work, which includes the demolition of existing facilities. Most of the deconstruction work will be carried out under asbestos conditions. Asbestos removal will be at a moderate to high risk level in all areas affected by deconstruction. This work will be carried out in accordance with the specifications and instructions of the expert firm in hazardous materials (see the specifications concerning hazardous materials - documentation to download - link available on document DSUM-1). The building will be occupied for the duration of the works. The work must be carefully coordinated in such a way as to ensure the safety of the occupants, to minimize the impact on the activities of the occupants, to maintain the electromechanical services in operation in the other spaces occupied on the same floors and on other floors. The Work includes the materials, scaffolding, labour, tools, equipment, machinery, transportation, temporary works, temporary services and supervision necessary for the execution of the work. architecture, mechanics and electricity, which includes a very large part of the demolition, but also certain construction and reinstallation works, all in accordance with the applicable conditions of the drawings, specifications and documents mentioned in these specifications, including the works and services implicitly required and necessary for the completion of the work. Calendar : The Contractor agrees to take all necessary measures to meet the schedule for starting the work on or around August 8, 2022, allowing the Certificate of Final Acceptance to be issued by December 2, 2022 at the latest . Performance bond and materials and services of each corresponding 50% is required.

Award

Educational

$4,071,300.00

Public - State/Provincial

Asbestos Abatement, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
193
Bidding Soon
2,972
All Active Projects
1,309
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 16, 2022

August 8, 2022

December 8, 2022

img_map_placeholder

2900 Edouard Montpetit Blvd, Montreal, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.