Renovation of a water / sewer project in Berkeley Township, New Jersey. Completed plans call for the renovation of a water / sewer project.

**As of September 6, 2022, This project has not yet been awarded. A timeline for award has not yet been established.** ENGINEER’S ESTIMATE: $27mil to $33mil CWPCF Process Improvements, the Work, includes, but is not necessarily limited to furnishing and the installation: 1. At the Main Influent Pump Station (MIPS) of two main influent dry pit submersible centrifugal pumps/motors to replace MIPS pumps/motors MP-1 and MP-4, two electric motors to replace MIPS pumps MP-2 and MP-3 motors, four variable frequency drives to replace MIPS pumps (MP-1, MP-2, MP-3 and MP-4) liquid rheostat control system, 54" piping and fittings. 2. Buried 54" piping, valves, fittings and chambers on the discharge side of MIPS and the Emergency Influent Pump Station (EIPS). 3. At the Grit and Screening Building, improvements of three aerated grit chambers with stacked tray settling devices and one new grit chamber with stacked tray settling devices, grit washing and dewatering systems, piping, valves, and fittings. 4. Two new 54" buried primary distribution pipes, a primary distribution box, 36" flowmeters and piping, chambers, and 36" influent piping to four existing primary clarifiers. 5. Replacement of buried 42-inch diameter equalization valve, piping and fittings. 6. Replacement of four sludge pumps/motors, piping and fittings at the Primary Sludge Building. 7. 16" and 20" buried plant drain piping and manholes. 8. New receiving station for fats, oils, and grease. 9. Replacement of pumps, motors, valves, and fittings, at the Service Water Building. 10. Flow measurement meters at the Aeration Basins. 11. Electrical distribution systems, plumbing distribution systems, structural work, odor control, HVAC systems, concrete chambers, instrumentation, controls, exploratory test pits, manholes, fire protection, supports, line-stops, wet-taps, and., demolition. This contract or subcontract is expected to be funded in part with funds from the New Jersey Department of Environmental Protection and the New Jersey Environmental Infrastructure Trust. Neither the State of New Jersey, the New Jersey Environmental Infrastructure Trust nor any of their departments, agencies, or employees is, or will be, a party to this contract or subcontract or any lower tier contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-3, 4, 5, 9 and 10. In accordance with N.J.S.A. 40A:11-21, each Bid shall enclose Bid Security, as specified in the Instructions to Bidders, in the amount of ten percent (10%) of the Bidder's Bid, but not in excess of $20,000. Please copy the Engineering and Construction Department Contract Specialist Daniela DeVita (ddevita@ocua.com) on any emails or correspondence you may send to the Construction Manager or the Authority. The Authority is doing everything within its capabilities to protect employees' health, safety and welfare, while at the same time continuing to provide the level of services expected by our participants. We are committed to ensuring the workplace is safe and healthy for all employees. As a potential Bidder for this Project, the Authority asks that you screen any proposed attendees that you may have attend any site visit. Limit attendance to one attendee from your firm at the most. It is also asked of you, to perform a specific screening of your employee(s) whom may be assigned to attend these meetings out of an abundance of caution and in the interest of public health. All questions or inquiries concerning the Bidding Documents or the Work shall be submitted in writing to the Engineer. Socially and Economically Disadvantaged (SED) Participation- a. This project is being funded as described in Section 00100 Article 15 and the successful Bidder must comply with all the provisions of N.J.A.C. 7:22-9 et seq. for the participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SEDs). b. Bidders are required to comply with the requirements of P.L. 1975, c.127. c. The Owner has prepared a socially and economically disadvantaged utilization business plan which provides for a goal of not less than 10 percent of total amount of contract award be awarded by the successful Bidder to business concerns, owned and controlled by one or more socially and economically disadvantaged (SED) individuals. d. The successful Bidder shall prepare and submit their own SED utilization plan to the Authority and the NJDEP Office of Equal Opportunity and Public Contract Assistance within 30 days of the awarding of the Contract. A list of SED businesses is available online at www.state.nj.usidepleo or Office of Equal Employment and Public Contract Assistance, P.O. Box 402, Trenton, New Jersey 08625, 609-984!9742. The Owner, Contractor, and Subcontractors/Suppliers shall comply with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24, 4.17(a)24, and 7:22-9 et seq. Award subject to any agreed extension of the period for holding Bids, the Owner will act within sixty (60) days after the date of Bid opening to award the Contract lowest responsible bidder, reject all Bids or take any other appropriate action. The Owner expressly reserves the right to reject Bids, waive any minor informalities or non-material exceptions, re-advertise for Bids or withhold the award for any reason the Owner determines, in accordance with the applicable law. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$37,500,000.00

Public - County

Renovation

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Protection of Adjacent Construction, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Roofing and Siding Panels, Membrane Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Potable-Water Storage Tanks, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Power Filters and Conditioners, Capacitors, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Electrical Utilities, Site Grounding, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
238
Bidding Soon
3,990
All Active Projects
1,826
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2022

September 16, 2022

img_map_placeholder

501 Hickory Ln, Berkeley Township, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Central Water Pollution Control Facility(CWPCF) Process Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.