BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Paoli, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of July 18, 2022, the project has been awarded. A timeline for construction has not been confirmed. Project No -22-5558.00 The project consists of removing and replacing 972 feet of sanitary sewer main and appurtenances. Each bid must be accompanied by a certified check drawn to the order of Willistown Township or a Bid Bond in favor of Willistown Township in the amount of 10% of the bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act' Bidders are advised that prevailing minimum wage rates promulgated by the Pennsylvania Secretary of Labor must be paid to workers employed on this project. No bid may be withdrawn within sixty (60) days of the bid opening date. The Willistown Township reserves the right to reject all bids and waive any bidding informalities. 1. Replace approximately 972 LF of existing sewer with ductile iron pipe and SDR-35 PVC sanitary sewer, as indicated on the Drawings. 2. Replace existing laterals within the right-of-way and connect existing building sewers to the new sanitary sewer piping. Laterals connecting to DIP will be replaced with C-900 PVC. Laterals connecting to SDR-35 PVC will be replaced with SDR-35 PVC. 3. Maintain sewer service through use of bypass pumping and temporary connections as required. 4. Complete all required paving and vegetative restoration, as shown on the Drawings. 1. Replace approximately 972 LF of existing sewer with SDR-35 PVC sanitary sewer, as indicated on the Drawings. 2. Replace existing laterals within the right-of-way and connect existing building sewers to the new sanitary sewer piping. Laterals will be replaced with SDR-35 PVC. 3. Maintain sewer service through use of bypass pumping and temporary connections as required. 4. Complete all required paving and vegetative restoration, as shown on the Drawings. CLARIFICATION DEADLINE 6/24/2022 4:30 PM *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$459,177.00

Public - City

Site Work

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
384
Active Projects
185
Bidding Soon
2,971
All Active Projects
1,433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

July 30, 2022

img_map_placeholder

Fairview Rd, Paoli, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.