BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Prescott, Arizona. Completed plans call for site work for a transportation facility.

**As of August 01, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Runway 3L-21R Lighting and Signage and 3L-21R PAPI Relocation The intent of the Plans and Specifications is to prescribe a complete work for the described project which the Contractor shall perform in a manner acceptable to the City Airport Director and in full compliance with the terms of the Contract. Unless otherwise specified in the Special Provisions, the Contractor shall furnish all materials, labor, tools, equipment, water, light, power, transportation, superintendence, temporary construction of every nature, and incidentals, but not limited to, dust and traffic control measures, and to perform all work involved in executing the Contract in a satisfactory and workmanlike manner within the specified time. All Construction shall conform to Maricopa Association of Governments (MAG) and City of Prescott Construction Standards and Specifications, latest revisions, unless specifically approved by the City and modified on the plans, in conjunction with the latest revisions of the Maricopa Association of Governments Standard Specifications and Details (MAG Standards), unless specifically modified on the plans, all in conjunction with the Federal Aviation Administration (FAA) Advisory Circulars (AC) as identified and specified within the plans and contract documents. All subsequent questions shall be submitted via email by Thursday June 2nd to allow sufficient time to respond. The City of Prescott reserves the right to accept or reject any or all bids and waive any informality deemed in the best interest of the City and to reject the bids of any persons who have been delinquent, unfaithful, or unclear to any contract with the City of Prescott. Substantial Completion (45 Calendar Days) Final Completion (30 Calendar Days after Substantial Completion) Dibble Project No: 1018102.25

Award

Transportation Terminals

$713,215.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
216
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

September 1, 2022

img_map_placeholder

6600 Airport Ave, Prescott, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.