BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a road / highway in Salinas, California. Completed plans call for the renovation of a road / highway.

As of September 8, 2022, a general contractor has been awarded and construction is expected to start November 2022. The County of Monterey (County) - Department of Public Works, Facilities and Parks proposes to replace the existing Start-Finish pedestrian bridge and repave the existing race track. The Start-Finish Bridge work generally consists of demolition of the existing Start-Finish bridge, starter's platform, columns and footings; and construction of two prefabricated pedestrian bridge spans and concrete bridge footings and abutments; a starter's stand; concrete pedestrian walkways, ramps and stairs; railings and fencing; retaining walls; earthwork and drainage improvements; and utility relocations. The racetrack repaving work generally consists of micro milling and cold planing of AC pavement; HMA patching and paving; overlaying with specialty racetrack HMA mix; construction of HMA shoulders; chip sealing shoulder areas; reconstruction of racetrack kerbs; shoulder grading; drainage improvements; and other miscellaneous construction. The Engineer's Estimate for the construction cost is approximately $9,725,000. 1. Relocation of Joint Utility Pole - Contractor shall coordinate schedule for pole relocation with PG&E. 2. Timing loop installation - Contractor shall coordinate schedule for timing loop installation. Contractor shall allow at least 5 weekdays (Monday to Friday) for the work, beginning 7 calendar days after completion of racetrack repaving. 3. Low voltage system - Contractor shall coordinate schedule with County's low voltage contractor. Contractor shall allow at least 5 weekdays (Monday to Friday), prior to demolition, for removal of existing system infrastructure (demolition), and at least 20 weekdays (Monday to Friday) for installation and testing of low voltage system infrastructure near the end of the construction period. 4. Racetrack striping and marking - Contractor shall coordinate schedule for racetrack striping and marking. Contractor shall allow at least 10 weekdays (Monday to Friday) for the work, beginning 7 calendar days after completion of racetrack repaving. 5. Kerb painting - Contractor shall coordinate schedule for kerb painting. Contractor shall allow at least 3 weekdays (Monday to Friday), beginning 14 calendar days after completion of kerb construction.

Award

Roads / Highways

$9,290,840.00

Public - City

Renovation

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
105
Bidding Soon
1,311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

November 1, 2022

Project location map

1021 Monterey Salinas Hwy, Salinas, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.