BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a mixed-use development in New Britain, Connecticut. Conceptual plans call for site work for a playground / park / athletic field; and water / sewer project.

The project will include installation of Musco Sport Lighting for greener technology and Control Link: including poles, ballast/light fixtures, all electrical work required for proper installation, and all other work as required. Renovate entire turf and clay areas. Renovations are to include site work, sub-surface drainage, strip existing surface and replace with suitable soils and infield mix, establish new turf, fencing camera system, garbage receptacles, team benches, bleachers, irrigation, and all other park improvements as required. Construction to conform all applicable federal, state, and local handicap accessibility laws. As of June 30, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$315,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
882
Active Projects
317
Bidding Soon
7,168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

Project location map

2159 Stanley St, New Britain, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.