EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 13, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Culver City, California. Completed plans call for the renovation of a municipal facility.

The work to be done consists of construction of a roof enclosure above the existing fish tanks. Bid Alternate "A": Install owner provided prefabricated light gage steel building frame as required by the Plans, Specifications' and Contract Documents Bid Alternate "B": Furnish and install structural steel building frame per structural engineers as required by the Plans, Specifications and Contract Documents. Each alternate requires furnishing all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications and Contract Documents for the above-stated project. The items of work to be done hereunder further consist of; roofing repair and/or replacement as well as protection of Fish Tanks, live fish in the tanks, surrounding site and buildings and daily clean-up will be required. The surrounding site includes Centinela Ave. and sidewalk to the south, Alley to the north, West Vector control offices to the east and neighboring property to the west. The Project must be completed within one Three hundred and sixty (360) calendar days, beginning ten (10) calendar days after the date on which the Notice to Proceed is sent by the Owner to the Contractor. Working time shall include product procurement and lead time. Bidders may submit bids at any time prior to the Submission Deadline via personal delivery, USPS or carrier of their choice. A special drop off desk will be available to facilitate submittals on the final day, Submission Deadline, between the hours of 9:00 AM and 11:30 AM, for bids submitted on the last day. Bids received after 11:30 AM shall be considered invalid and will be returned to the bidders unopened. Site Visit - Each prospective bidder is responsible for fully acquainting themselves with the conditions of the Project Site, to fully understand the facilities, difficulties and restrictions which may impact the total and adequate completion of the Project. Deadline for Requests for Information (RFI's) is Friday November 24 , 2023 at 3:00 P.M. Any questions addressing the interpretation or clarification of the Bid Forms or the Bid Documents must be submitted to the District's Representative in writing via email to jvarda@arc-pros.com. All questions must be numbered and only one question per number. Bid Security and Insurance Certificates; Performance and Payment Bonds: Bids must be accompanied by cash, a certified or cashier's check, or a Bid Bond in favor of the Owner in an amount not less than ten percent (10%) of the submitted Total Bid Price. The successful Bidder will be required to furnish, within ten days of the written Notice of Award, insurance certificates and endorsements as described in the Bid Documents, a Performance Bond in the amount of one hundred percent (100%) of the Total Bid Price, and a Payment (Material and Labor) Bond in the amount of one hundred percent (100%) of the Total Bid Price, on the forms provided and in the manner described in the Bid Documents. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California-admitted surety with a current A.M. Best's rating no less than A: VII and satisfactory to the District. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the District. Owner reserves the right to reject any or all Bids, waive any informality or irregularity in any Bid received, and to be the sole judge of the merits of the respective Bids received. The award, if made, will be made to the lowest responsible bidder whose bid is determined responsive to the Bid Documents.

Bid Results

Municipal

$2,040,236.00

Public - County

Renovation

64

23

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roofing and Siding Panels, Composite Wall Panels, Flashing and Sheet Metal, Flexible Flashing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Relief Vents, Smoke Vents, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Plastering, Portland Cement Plastering, Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Hydraulic Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
153
Bidding Soon
2,410
All Active Projects
1,002
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2023

April 4, 2024

img_map_placeholder

6750 S Centinela Ave, Culver City, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Operations & Storage Facilities Phase III: Construction of New Roof Structure above Existing Fish Tanks Platform

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.