BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Huntington Beach, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Alley West of Florida Street and Georgia Street (CC 1663): The project consists of the installation of approximately 960 linear feet of 6-inch diameter PVC, AWWA C900 (DR-14) water pipeline, 10,250 square feet of alley pavement replacement, and reconstruction of alley approaches and cross gutter within the alley west of Florida Street between Lincoln Ave and Indianapolis Ave. The project will also consist of the installation of approximately 285 linear feet of 8-inch diameter PVC, AWWA C900 (DR-18) water pipeline within Georgia St between Knoxville Ave and Joliet Ave. Kiner-Gleada Water Main Improvement Project (CC 1664): The project consists of the installation of approximately 1,270 linear feet of new 8-inch diameter AWWA C900 DR14 water pipeline, fittings, and appurtenances, reconnection to existing mains, new water services, and abandonment of old water mains and services in Kiner Drive and Gleada Lane, including trench pavement restoration and slurry sealing curb-to-curb within project limits. The project does NOT have a mandatory pre-bid meeting. However the Contractor will be required to inspect the site and review the plans and specifications and determine the work to be done and the Contractor's responsibilities. The City's representatives will be available to address questions. Project Duration: 180 Work Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10%

Post-Bid

Water / Sewer

$2,600,000.00

Public - City

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
114
Bidding Soon
2,448
All Active Projects
1,081
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

July 25, 2022

img_map_placeholder

Multiple Locations, Huntington Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.