Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a civil project in Terrell, Texas. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
As of August 29, 2022, the general contractor has already awarded this project to the subcontractors and is now currently working on the contracts. Construction is estimated to start sometime in December 2022 to January 2023. For Ps&e Package Questions Call Lane Selman, P.e. 2750 S Washington Kaufman, Tx 75142 972/962-3617 Length: 2.1940 Mi For Questions Regarding a Proposal Call 512/416-2498 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Kaufman 0095-03-080 Lawson Rd (Dallas / Kaufman C/l) Us 80 F 2022(793) Fm 460 Length: 1.9840 Miles Kaufman 0095-03-085 at Fm 460 Us 80 Br 2022(860) . Length: 0.21 Miles TXDOT - US 80 - Reconstruct Existing Roadway and Bridge Replacement
Pre-Construction/Negotiated
Bridges / Tunnels
$119,542,801.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2022
December 19, 2022
US-80, Terrell, TX
Related To This Project
Terrell, TX
Bid Date: Jan 06 2022
Terrell, TX
Bid Date: Mar 03 2022
Terrell, TX
Bid Date: Aug 09 2022
Terrell, TX
Bid Date: Aug 30 2022
Terrell, TX
Bid Date: Jul 29 2021
Terrell, TX
Bid Date: Sep 12 2022
Terrell, TX
--
Terrell, TX
Bid Date: Sep 20 2022
Terrell, TX
Bid Date: Jun 17 2021
Terrell, TX
Bid Date: Oct 07 2021
Terrell, TX
Bid Date: Mar 07 2019
Terrell, TX
Bid Date: Aug 18 2022
Terrell, TX
Bid Date: Aug 18 2022
Terrell, TX
Bid Date: Apr 14 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.