BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bethel Park, Pennsylvania. Completed plans call for site work for a water / sewer project.

The general description of the Work includes, but is not limited to the following: Contract One - General Construction: This project consists of providing Cured-In-Place-Pipe (CIPP) lining of approximately 12,500 LF of existing concrete sanitary sewer pipe ranging in diameter from 27-inches to 33-inches (Piney Fork Interceptor), as well as CIPP lining of approximately 7,000 LF of existing concrete sanitary sewer pipe ranging in diameter from 18-inches to 30-inches (Catfish Run Interceptor). The project also includes Cured in Place lining rehabilitation of approximately 81 manholes of varying depth along the interceptors. The Contractor will be required to provide pre-CCTV and post-CCTV inspections, all necessary cleaning, and all necessary bypass pumping to facilitate the installation of the lining system. Rip rap streambank stabilization at certain manholes will be required as well as locating and raising various manholes. Each proposal shall be accompanied by a Bid Bond in the amount of ten percent (10%) of the total bid which will be returned upon award of the Contracts. The successful bidder will be required to furnish a performance bond and labor and material bond at contract initiation for the full amount of the contract. Upon accepted completion of the contracts, the successful bidder will be required to provide a two (2) year maintenance bond for the work performed. All materials and equipment provided must meet the requirements of all local, state, and federal regulations. The Bethel Park Municipal Authority reserves the right to accept or reject any or all bids and to waive any informality in any bids should it consider same to be in its best interest. Bids may not be withdrawn for a period of sixty (60) days after date of receiving bids. All inquiries should be directed to Ben Briston, P.E. at 412-454-5566 or bbriston@wadetrim.com.

Award

Water / Sewer

$4,923,239.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
39
Bidding Soon
876
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

July 11, 2022

img_map_placeholder

Multiple Locations, Bethel Park, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.