Site work for a water / sewer project in El Paso, Texas. Completed plans call for site work for a water / sewer project.

As of June 29 2023 this is in construction. Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: Two Access structures along the existing 3 90-inch Reinforced Concrete Pipes consisting of, but not limited to: 1. Insurance, Bonds, and move in related expenses. 2. Right of Way and Site Preparation. 3. Preconstruction and post construction video. 4. Removal of approximately 68 square yards of stabilized base and asphalt pavement. 5. Removal of approximately 3 stormwater manholes. 6. Removal of approximately 150 linear feet of existing 90-inch reinforced concrete stormwater pipe. 7. Excavation and removal from site of approximately 2,897 cubic yards of existing soil. 8. Furnishing and installing compacted in place approximately 1,262 cubic yards of suitable structural fill. 9. Furnishing and installing approximately 5,370 square feet of temporary special shoring for excavation protection. 10. Clean / Remove dirt, rock, sediment from existing 90-inch Reinforced Concrete Stormwater pipes. 11. Furnishing and installing approximately 68 square yards stabilized base and asphalt pavement for pedestrian path. 12. Furnishing and installing complete in place 2 locations of precast-arch-bridge structures including cast in place concrete end-walls, and all components and appurtenances that will serve as the access structure vault. 13. Furnish and install complete in place 2 access ramps consisting of approximately 40 linear feet (Each ramp) of 6'x4' concrete box culvert for the access vault structures including access covers, joint sealants and protective bollards. 14. Furnishing and installing complete in place two sliding gates outside the access vault structures. 15. Furnish and install complete in place 2 bolted stormwater manholes per box on the access structures. 16. Furnish and install complete in place approximately 45 cubic yards of cast in place a reinforced concrete slab foundation as shown on the drawings. 17. Furnish and install complete in place approximately 106 cubic yards of cast in place reinforced concrete footings for end-walls and precast bridge units. 18. Repair Spalls on Reinforced Concrete Pipes. 19. Repair Spalls on Reinforced Concrete Pipes With Partially Exposed Reinforcement Complete in Place. 20. Repair Existing Joints at Reinforced Concrete Pipe Complete in Place. 21. Repair Cracks in Reinforced Concrete Pipe Complete in Place. 22. Furnishing and installing approximately 223 square yards of construction exits. 23. Removing 223 square yards of construction exits at project completion. 24. Furnish and install approximately 440 linear feet temporary sediment control fence. 25. Remove approximately 440 linear feet of temporary sediment control fence. The project description, as shown above, is only a general overview of this project For additional information, submit your inquiry to the Purchasing / Contracts email address: Purchasing.Info@epwater.org.

Under Construction

Water / Sewer

$3,589,659.00

Public - City

Site Work

27

10

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
17
Bidding Soon
407
All Active Projects
153
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 23, 2022

August 22, 2022

September 21, 2023

img_map_placeholder

Multiple Locations, El Paso, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.