BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of an educational facility in Amherst, Massachusetts. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Campus General Construction, The work shall be completed on or before 06/30/2023 from the Notice to Proceed and in general the project includes: General Building Construction. No pre-bid meeting.Estimate: $1,000,000.00 Any bid Submitted to the UMASS Supplier portal after the date and time specified will not be considered. No hard copies will be accepted.Minimum rates of wages to be paid on the project have been determined by the Commissioner of Labor & Workforce Development under the provisions of Sections 26 & 27, Chapter 149 of the General Laws. Wage rates are listed in the Contract form portion of specification book. Each General Bid proposal must be secured by an accompanying deposit of 5% of the total bid. Deposits shall be in the form of a BID BOND, CERTIFIED, TREASURER'S or CASHIER'S CHECK payable to the University of Massachusetts. Deposits shall be returned in accordance with the law. All bids for this project are subject to the provisions of either or both Massachusetts General Laws, Chapter 30, Section 39M as amended and Massachusetts General Laws, Chapter 149, Sections 44A 44I inclusive. The Awarding Authority reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Messenger and other type of pickup and delivery services are the agent of the bidder and the University assumes no responsibility for delivery or receipt of the documents.No personal checks or cash will be accepted as deposits. Refunds will be made to those returning the documents in satisfactory condition on or before 07/02/2022, otherwise the deposit shall be the property of the University. The documents may also be seen, but not removed or taken out of the following locations: University of Massachusetts Physical Plant Building 2nd floor Plan Room 360 Campus Center Way Amherst, MA 01003 Description Of Work: Campus - General Construction

Post-Bid

Educational

$1,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
760
Active Projects
408
Bidding Soon
5,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 1, 2022

Project location map

360 Campus Center Way, Amherst, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.