BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Bellville, Ohio. Completed plans call for the renovation of a educational facility.

The Project consists of all labor, materials, and services necessary for the timely and proper completion of scope of work outlined in Bid Package for the Clear Fork Middle/High School HVAC Improvements ("The Project"), all in accordance with the Contract Documents. Bidder shall furnish a Bid Guaranty, as prescribed in Sections 153.54, 153.57, and 153.571 of the Ohio Revised Code, in the form of either: (1) a bond for the full amount of the bid in the form of the Bid Guaranty and Performance Bond included in the Contract Documents; or (2) a certified check, cashier's check, or irrevocable letter of credit in an amount equal to 10% of the bid. The bid amount shall be the total of all sums of the bid including all add alternates but excluding all deduct alternatesThe Board of Education reserves the right to reject any, or part of any, or all of said proposals. Successful bidder/s shall be required to furnish bonds in the amount of one hundred percent (100%) of the contract/s for both performance and labor and materials. SCOPE OF WORK A. Work includes, but is not limited to: 1. Furnish and install new rooftop units. 2. Coordinate new equipment structural sizes and locations for all new equipment. 3. Furnish and install all required condensate, equipment and drain piping. 4. Furnish and install duct insulation. 5. Furnish and install new instruments as shown. 6. Furnish and install new ductwork. 7. Furnish and install air balancing. 8. Perform final setting and leveling of all new equipment. 9. Perform start-up for all HVAC systems and commission same in accordance with the commissioning requirement. 10. Provide and/or participate in training of Owner's personnel on the use of all new HVAC systems. 11. Refer to drawings for Schedules of HVAC Equipment. 12. The contractor shall exercise adequate protective and safety measures for all persons and property and shall be responsible for any damages or injuries arising from the execution of this work. 13. Alterations and additions to existing work shall include the requisite dismantling of the old equipment, rigging, wrecking, hauling, protections of permanent equipment and the building structures, and cleaning up. Care shall be exercised to keep dust and dirt to a minimum and to confine it to the area where the removal work is being performed. All debris shall be promptly removed.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

18

11

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
64
Bidding Soon
1,237
All Active Projects
516
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

July 25, 2022

img_map_placeholder

987 State Rte 97 E, Bellville, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.