EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Bellville, Ohio. Completed plans call for the renovation of a educational facility.

The Project consists of all labor, materials, and services necessary for the timely and proper completion of scope of work outlined in Bid Package for the Clear Fork Middle/High School HVAC Improvements ("The Project"), all in accordance with the Contract Documents. Bidder shall furnish a Bid Guaranty, as prescribed in Sections 153.54, 153.57, and 153.571 of the Ohio Revised Code, in the form of either: (1) a bond for the full amount of the bid in the form of the Bid Guaranty and Performance Bond included in the Contract Documents; or (2) a certified check, cashier's check, or irrevocable letter of credit in an amount equal to 10% of the bid. The bid amount shall be the total of all sums of the bid including all add alternates but excluding all deduct alternatesThe Board of Education reserves the right to reject any, or part of any, or all of said proposals. Successful bidder/s shall be required to furnish bonds in the amount of one hundred percent (100%) of the contract/s for both performance and labor and materials. SCOPE OF WORK A. Work includes, but is not limited to: 1. Furnish and install new rooftop units. 2. Coordinate new equipment structural sizes and locations for all new equipment. 3. Furnish and install all required condensate, equipment and drain piping. 4. Furnish and install duct insulation. 5. Furnish and install new instruments as shown. 6. Furnish and install new ductwork. 7. Furnish and install air balancing. 8. Perform final setting and leveling of all new equipment. 9. Perform start-up for all HVAC systems and commission same in accordance with the commissioning requirement. 10. Provide and/or participate in training of Owner's personnel on the use of all new HVAC systems. 11. Refer to drawings for Schedules of HVAC Equipment. 12. The contractor shall exercise adequate protective and safety measures for all persons and property and shall be responsible for any damages or injuries arising from the execution of this work. 13. Alterations and additions to existing work shall include the requisite dismantling of the old equipment, rigging, wrecking, hauling, protections of permanent equipment and the building structures, and cleaning up. Care shall be exercised to keep dust and dirt to a minimum and to confine it to the area where the removal work is being performed. All debris shall be promptly removed.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

18

11

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
108
Bidding Soon
1,503
All Active Projects
646
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

July 25, 2022

img_map_placeholder

987 State Rte 97 E, Bellville, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Clear Fork Middle/High School HVAC Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.