BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a transportation facility in Boulder City, Nevada. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

This work shall include furnishing all labor, material and equipment to complete the Rehabilitate Runway '15-33' & Electrical Improvements Project, at the Boulder City Municipal Airport. Project will include, but not be limited to, asphalt seal coat, crack seal, pavement markings, electrical vault building upgrades, high mast lighting, airport beacon, and electrical improvements. Questions Deadline: 5/31/2022 12:00 PM (PT) DBE (13.5%) Goals for minority participation for each trade: 13.9 Goals for female participation in each trade: 6.9% Substantial Completion - 45 calendar days + Final Completion of the work shall occur not more than thirty (30) calendar days after the Substantial Completion date. . Scope / Schedule Changes Existing Runway '15-33' is approximately 4,000 feet in length and 75 feet in width. Data obtainedin 2018 from Nevada Department of Transportation (NDOT) indicates the Pavement Condition Index (PCI) for Runway '15-33' was 90. This project includes the installation of crack seal and seal coat of approximately 38,850 square yards of the Runway '15-33' asphalt pavement and the remarking of the runway. This project also includes the installation of new electrical improvements on Runway '15-33'. New LED runway edge light fixtures shall be installed on existing bases and new LED signs shall be installed on new sign bases. This project will also include a new homerun ductbank and vault upgrades for new dedicated circuits for Runway '15-33' and '9-27'. There will be approximately 1,600 LF of new duct bank installed as part of this project along the south side of Taxiway 'D'. The scope of work for the project also includes installation of a new beacon that will be installed to replace the existing beacon that has served its useful life. Also included in the scope of work for the project is the installation of two (2) new LED high mast lighting fixtures on new poles, north of the Transient Apron and the installation of 2 lighted wind c

Bid Results

Transportation Terminals

$2,200,995.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
445
All Active Projects
206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

July 18, 2022

img_map_placeholder

Airport Rd, Boulder City, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.