BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 3, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a sidewalk / parking lot in The Village, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk Improvements - Stratford Drive from Westchester Drive to Britton Road Bids shall be sealed and marked "SEALED BID ENCLOSED FOR THE VILLAGE SIDEWALK IMPROVEMENTS - Stratford Drive from Westchester Drive to Britton Road. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and holidays, before the time set for opening of bids, as well as bids received after the time set for the opening of bids, will not be considered and will be returned unopened. A Bid Bond in the amount of 5% of the bid, an Anticollusion Affidavit, and a Business Relationships Affidavit shall accompany the sealed proposal. The Bidder shall only use the City of The Village Bid Form and affidavits or photocopies thereof. All forms must be signed, and all affidavits sworn to and notarized. All bids shall be typewritten or in ink. The City of The Village reserves the right to reject any all bids and reserves the right to waive immaterial defects and irregularities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$204,016.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
71
Bidding Soon
700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2022

August 15, 2022

Project location map

Stratford Dr, The Village, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.