BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Saint John, New Brunswick. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work under this Contract includes, but is not limited to the following: .1 The removal and disposal of existing Stormwater infrastructure. .2 The removal and disposal of the existing asphalt parking lot. .3 The removal and disposal of the existing subsurface heating system located below the parking lot asphalt. Subsurface heating system is comprised of 12mm to 50mm pipes encased in concrete. Subsurface heating system is throughout the entirety of the parking lot. .4 Supply and Instalation of new Catch basins, Storm Manholes, and Storm piping as indicated on the drawings. .5 Supply and instalation of new light poles and exterior lighting fixtures including underground electrical wiring as indicated on the drawings. .6 Supply and instalation of new parking security gates including wiring and conduit instalation. .7 Concrete curbing, sidewalk replacement, grassed islands, and concrete islands for security gates. .8 Removal of existing concrete stairs and relacing with new as indicated on the drawings. .9 Removal of existing access ramp and replacing with new as indicated on the drawings. .10 Concrete repairs to the bases of the five pillars at the front of 110 Charlotte Street as indicated on the drawings. .11 Instalation of waterproofing membrane at the rear of the building as indicated on the drawings. .12 New asphalt pave throughout the parking lot as indicated on the drawings. .13 Line painting of parking stalls, accessible parking symbols, and vehicle travel arrows. .14 Development of a phasing plan to ensure access into and out of parking lot, while maintaining a minimum of 30 stalls during construction. .15 Erect new chainlink fence. .16 Supply and install three (3) concrete foundations and associated conduits for electric vehicle charging stations (EVCS) as detailed on the drawings. .17 Supply and install six (6) protective bollards and foundations associated with EVCS bases as detailed on the drawings. Documents are available through the Construction Association of NB.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
6
Bidding Soon
122
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

July 15, 2022

img_map_placeholder

110 Charlotte St, Saint John, NB

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.