BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2022 at 8:00 PM

Updated November 14, 2023

Site work and paving for a civil project in Melrose Township, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of September 13, 2022, this project has been awarded to Million Construction Ltd in the amount of $402,382.50. City/County: Adams Resurfacing of TR 467 (Lancaster Lane), installation of storm sewer and drainage structures, PCC driveway pavement, seeding and other ancillary work. Tree Removal 28 Unit Earth Excavation 420 Cu Yd Trench Backfill 32 Cu Yd Seeding, Class 1 0.65 Acre Erosion Control Blanket 2010 Sq Yd Temporary Ditch Checks 130 Foot Inlet And Pipe Protection 14 Each Aggregate Base Course, Type A 263 Ton Bituminous Materials (Tack Coat) 2268 Pound HMA Surface Removal - Butt Joint 224 Sq Yd HMA Binder Course, Il-9.5fg, N50 50 Ton HMA Binder Course, Il-19.0, N50 440 Ton HMA Surface Course, Mix "C", N50 260 Ton Incidental HMA Surfacing 55 Ton PCC Driveway Pavement, 6 Inch 182 Sq Yd Pavement Removal 280 Sq Yd Driveway Pavement Removal 290 Sq Yd Pipe Culvert Removal 248 Foot PRC Flared End Sections 18" 2 Each Storm Sewers, Class A, Type 1 18" 57 Foot Storm Sewers, Class B, Type 1 12" 517 Foot Storm Sewers, Class B, Type 1 15" 403 Foot Storm Sewers, Class B, Type 1 18" 290 Foot Pipe Underdrains 8" (Special) 80 Foot Inlets, Type A, Type 8 Grate 12 Each Mobilization 1 L Sum Mulch 781 Sq Yd Porous Granular Backfill, Special 72 Cu Yd Inlets, Special, With Special Frame and Grate 2 Each Traffic Control and Protection, (Special) 1 L Sum Project Location: Chesterfield Estates, southeast of Quincy, IL. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Resurfacing of TR 467 (Lancaster Lane) - 21-16140-00-FP

Award

Roads / Highways

$402,383.00

Public - County

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
37
Bidding Soon
514
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

August 5, 2022

Project location map

Lancaster Dr, Melrose Township, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.