BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2022 at 8:00 PM

Updated November 15, 2023

Site work and renovation of a water / sewer project in Austin, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A bid bond in the amount of 5% of the bid, issued by an acceptable surety, shall be submitted with each bid. A certified check or bank draft payable to the Lincoln Water Supply Corporation or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond Project shall be completed within two hundred seventy (270) consecutive calendar days. The engineer's estimate is $125,000 - $150,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A Pre-Bid Conference will NOT be held The Corporation reserves the right to reject any or all bids or to waive any informalities in the bidding.

Award

Water / Sewer

$136,649.00

Public - County

Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
6
Bidding Soon
1,843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.