Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to a mixed-use development in Gunnison, Utah. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for site work for a detention facility; pre-engineered storage facility; pre-engineered storage facility; and pre-engineered storage facility.
Project Description: The Department of Corrections has asked for help with the expansion of their machine shop at the Central Utah Correctional Facility. The Contractor will need to provide all labor, materials, equipment, etc. as outlined in the plans and specifications for the Base Bid. Please note, the contractor is to have all materials and equipment on-site before work on-site begins. A staging area will be provided on-site for materials and equipment if needed. If the Contractor is having items shipped directly to CUCF. The Contractor MUST be on-site to receive, unload, and stage those items. Deliveries will be turned away if the Contractor isn't on-site to receive them. Additionally, the Contractor MUST provide equipment to load/unload all shipments to the site. CUCF WILL NOT provide any equipment or manpower to unload the Contractor's items. The Contractor is to coordinate project start times with DFCM Project Manager as this Project will coincide with a DFCM roofing Project in the same area. Current start time is spring 2023. A DFCM Non-Disclosure Agreement Form is required for each person requesting viewing rights to the various project-related documents. Email the completed DFCM Non-Disclosure Agreement Form (which is provided in Buyer Attachments) to dfcmcontracts@utah.gov. Question Submission Close Date 6/7/2022 3:00 PM MDT
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$819,900.00
Public - State/Provincial
Addition, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2022
January 9, 2023
255 E 300 N St, Gunnison, UT
Related To This Project
Gunnison, UT
Bid Date: Mar 16 2020
Gunnison, UT
Bid Date: Aug 18 2022
Gunnison, UT
Bid Date: Sep 20 2022
Gunnison, UT
Bid Date: Sep 22 2022
Gunnison, UT
Bid Date: Aug 17 2022
Gunnison, UT
Bid Date: Jan 05 2023
Gunnison, UT
Bid Date: Jun 23 2022
Gunnison, UT
Bid Date: Jun 02 2022
Gunnison, UT
Bid Date: Apr 19 2022
Gunnison, UT
Bid Date: Jun 10 2022
Gunnison, UT
Bid Date: May 24 2022
Gunnison, UT
Bid Date: Dec 12 2022
DFCM Construction Pre-Qualified Mechanical - CUCF Warehouse & Culinary Freezer Replacement - 4878645
Gunnison, UT
Bid Date: Nov 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.