Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a transportation facility in Naugatuck, Connecticut. Conceptual plans call for site work for a transportation facility.

As of May 11, 2023, this project is in the conceptual phase. A developer has been selected but not awarded. A developer award is expected by August 2023. It is anticipated construction will start in fall 2023. *The closed solicitation has been included below for reference: For Downtown Revitalization/Transit Oriented Development Project (TOD) - Phase II The method of contractor selection has not been determined at this time

Conceptual

Transportation Terminals

$12,390,828.00

Public - City

Site Work

13

5

2

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,079
Active Projects
426
Bidding Soon
6,961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2023

Project location map

Multiple Locations, Naugatuck, CT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed