BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, asbestos abatement and new construction of a mixed-use development in Las Vegas, Nevada. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; for paving for a educational facility; and for asbestos abatement for a educational facility.

The work consists of the construction of a new middle school on the existing school site. The existing school will remain occupied and functional during construction of the new school. Construction will be phased to include: installation of new power feeds, demolition of existing portables, abatement and demolition of the existing school buildings, and construction of new ball fields, site work, off-site curbs & gutters, and demolition/extension of existing wet and dry utilities. The budget for construction cost for each project is as follows: J. Harold Brinley Middle School - $50,000,000.00 The CCSD Contact is: Alan Imperial, Project Manager 2022. Your firm will need to email brasemc@nv.ccsd.net and youngd@nv.ccsd.net to request the invitation for the digital RFP documents through CCSD's Bluebeam document viewer tool with instructions on how to view and print. SUBMITTAL DEADLINE FOR REQUEST FOR QUALIFICATIONS: Responses will be received via E-Builder portal provided to the applicants. Responses that are not received by the deadline time and date will not be accepted. Facsimiles or emailed responses will not be accepted. All general contractors must be pre-qualified with the Clark County School District and possess a Certificate of Eligibility from the Nevada State Contractors Board prior to submitting the Request for Qualification. The CMAR will provide the required pre-construction and construction services. Preconstruction services shall include assisting the design team with constructability matters, construction cost, value engineering, fast track options and scheduling. The construction services shall include determining a Guaranteed Maximum Price (GMP), procurement of all subcontractor contracts, and managing construction of the project. Selection Criteria and weighted values: General pass/fail, Applicant organization, workload and past performance (20%), Designated Project Manager and Superintendent experience on CMAR and Design Build with similar size and scope (20%), Project Management Plan (30%), Subcontractors and Safety Program (25%), Certificate of Eligibility for preference (5%). The estimated CMAR Phases for J. Harold Brinley Middle School will be Preconstruction Phase Services August 22, 2022 May 5, 2023 and Construction Services, August 21, 2023 May 4, 2025. The estimated CMAR Phases for Frank F. Garside Middle School will be Preconstruction Phase Services August 22, 2022 April 14, 2023 and Construction Services, July 24, 2023 May 4, 2025. The estimated CMAR Phases for C.W. Woodbury Middle School will be Preconstruction Phase Services August 22, 2022 May 26, 2023 and Construction Services, September 5, 2023 May 4, 2025. The Clark County School District invites all businesses, which includes women-owned, minority-owned, and disadvantaged business enterprise companies to participate. The Clark County School District is an equal opportunity employer and will not knowingly discriminate in any area of employment

Post-Bid

Educational

$50,000,000.00

Public - County

Asbestos Abatement, Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
435
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2022

August 21, 2023

img_map_placeholder

2480 Maverick St, Las Vegas, NV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.