Site work, paving and renovation of a mixed-use development in Scott Air Force Base, Illinois. Completed plans call for the renovation of a military facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Mod 2: Added Site visit notes, See below Mod 1: Site Visit will be Tuesday, 24 May. 0800 Blg 5026. Contract Contracting for base access on or before the 23rd. This is a request for quote using FAR 13 procedures for construction prepared in accordance with FAR 36.701, as supplemented with additional information included in this notice. This announcement is being issued as a request for quotation (RFQ) and constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2022-05. The following is needed: The work consists of furnishing all labor, materials and equipment necessary to repair the crumbling jack plate area within the existing 126ARW hangar space. The jack plate is used to elevate the aircraft during maintenance periods within the hangar. The current condition of the jack plate does not allow for effective jacking of the aircraft, therefore, it is currently unusable. See attached solicitation. The attached 1442 can be used as a quote template, but is not required. A quote can be in any format and needs to include description of plan to complete. The 1442 represents the Statement of Work, current Wage Rates, solicitation provisions, and clauses which are to included in final award. A new 1442 will be generated for bilateral review and signature before final award. If any conflicting information exists between the text of the solicitation as found on SAM.gov and the attached SF1442, the SAM.gov text takes precedence. Site Visit Notes: In attendance were companies C Rallo and Supplied Industrial Solutions. For the government: Mission Support Contracting, Civil Engineering, and Maintenance were represented. Site was surveyed. Existing plating was examined. The government stated that the platting was to remain as government property, the awardee either will move it to the side or transport to a government scrap pile, and the plate is unimportant to remain undamaged. Government does not have a use for it. All quotes are to assume the Statement of Work is correcting in how it describes the unknown concrete pads underneath visible area. Any real world deviation from the SOW's understanding of pre-existing conditions will need to be worked out in a modification to the Contract. For ease of invoicing, the concrete pad and painting can be separately priced. Period of Performance includes cure time. A fast cure time, allowing aircraft to transport over the pad will result in a better technically rated quote. But note: there are strength requirements in the SOW that must be met, faster cure is not to be at the expense of lower strength concrete than the SOW. This requirement is not a lowest price technically acceptable evaluation, but a best value with tradeoffs. The government will consider technical improvement or innovation above what is described on the Statement of Work and determine if the improvements are worth any price tradeoff. ***Quotes are NOT required to submit a technical exhibit showing prior experience. The quote can be on standard letterhead, with pricing, and then a description of technical approach. The Statement of Work will be modified to reflect potential awardee's technical approach. Government will consult government systems for past performance reviews. The government will provide escorts for the controlled area. ATO training level 1 required. Bathrooms will be available for workers. SOW is amended as follows: 1. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer's Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation's Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. 1b. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. 4. Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS), or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

Post-Bid

Military

$25,000.00

Public - Federal

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
45
Bidding Soon
832
All Active Projects
334
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2022

June 30, 2022

img_map_placeholder

126 Air Guard Way, Scott Air Force Base, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.